This paper firstly analyzes two movement detection schemes—eager cell switching scheme and lazy cell switching scheme. Then, aiming at their drawbacks, two improved solutions—region adjustment algorithm and improved region adjustment algorithm are proposed. In our solutions, the region is dynamically adjusted by current information of the link bandwidth in order to reduce the unnecessary increase in the movement detection delay. At last, analysis models are given to evaluate their performance. Numerical results show that our schemes outperform the ones in Mobile IP. q 2004 Elsevier B.V. All rights reserved
Abstract: The next generation of access technology will ensure wireless connectivity to any one at a...
License, which permits unrestricted use, distribution, and reproduction in any medium, provided the ...
With the recent developments in wireless networks, different radio access technologies are used in d...
The evolution and the spreading of wireless access technology and the consequent increase of user mo...
In networks supporting Mobile IP (MIP), the address configuration of a Mobile Node (MN) is an import...
Future wireless networks will be entirely based on the IP protocol. High degrees of portability avai...
different mechanisms to offer seamless mobility have been proposed. The fourth generation (4G) IP-ba...
The performance evaluation of mobile packet switching networks is nowadays an important topic in mob...
Numerous researches about Mobile IPv6 (MIPv6) have been proposed recently and the handover delay of ...
Nowadays, the researches about the IP connectivity for mobile node are in progress. In particular, M...
Abstract. In this paper, we propose an adaptive mobility management scheme for minimizing signaling ...
Mobile IP is the proposed standard for IP based mobile internetworking by the Internet Engineering T...
Seamless communication is becoming the main aspect for the next generation of the mobile and wireles...
The IEEE 802.11 standard was developed to support the establishment of highly flexible wireless loca...
In this work, we develop a novel mathematical model to analyze different location update protocols f...
Abstract: The next generation of access technology will ensure wireless connectivity to any one at a...
License, which permits unrestricted use, distribution, and reproduction in any medium, provided the ...
With the recent developments in wireless networks, different radio access technologies are used in d...
The evolution and the spreading of wireless access technology and the consequent increase of user mo...
In networks supporting Mobile IP (MIP), the address configuration of a Mobile Node (MN) is an import...
Future wireless networks will be entirely based on the IP protocol. High degrees of portability avai...
different mechanisms to offer seamless mobility have been proposed. The fourth generation (4G) IP-ba...
The performance evaluation of mobile packet switching networks is nowadays an important topic in mob...
Numerous researches about Mobile IPv6 (MIPv6) have been proposed recently and the handover delay of ...
Nowadays, the researches about the IP connectivity for mobile node are in progress. In particular, M...
Abstract. In this paper, we propose an adaptive mobility management scheme for minimizing signaling ...
Mobile IP is the proposed standard for IP based mobile internetworking by the Internet Engineering T...
Seamless communication is becoming the main aspect for the next generation of the mobile and wireles...
The IEEE 802.11 standard was developed to support the establishment of highly flexible wireless loca...
In this work, we develop a novel mathematical model to analyze different location update protocols f...
Abstract: The next generation of access technology will ensure wireless connectivity to any one at a...
License, which permits unrestricted use, distribution, and reproduction in any medium, provided the ...
With the recent developments in wireless networks, different radio access technologies are used in d...