In a multi-project environment, many projects are to be completed that rely on a common pool of scarce resources. In addition to resource constraints, there exist precedence relationships among activities of individual projects. This project scheduling problem is NP-hard and most practical solutions that can handle large problem instances rely on priority-rule heuristics and meta-heuristics rather than optimal solution procedures. In this paper, a Competent Genetic Algorithm (CGA), hybridized with a local search strategy, is proposed to minimize the overall duration or makespan of the resource constrained multi-project scheduling problem (RCMPSP) without violating inter-project resource constraints or intra-project precedence constraints. T...
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordi...
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling p...
A project scheduling problem investigates a set of activities that have to be scheduled due to prece...
In this paper we consider the resource-constrained project scheduling problem (RCPSP) with makespan ...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
This paper presents a genetic algorithm for the resource constrained multi-project scheduling proble...
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems ...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
Abstract. The resource-constrained project scheduling problem (RCPSP) is one of the most challenging...
In this paper we consider the resource-constrained project scheduling problem with multiple executio...
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatoria...
In this article, we present a parallel graphical processing unit (GPU)-based genetic algorithm (GA) ...
In this paper, the resource-constrained project scheduling problem with multiple execution modes for...
In this paper we present a genetic algorithm for the multi-mode resource-constrained project schedul...
In recent years, machine learning techniques, especially genetic programming (GP), have been a power...
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordi...
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling p...
A project scheduling problem investigates a set of activities that have to be scheduled due to prece...
In this paper we consider the resource-constrained project scheduling problem (RCPSP) with makespan ...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
This paper presents a genetic algorithm for the resource constrained multi-project scheduling proble...
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems ...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
Abstract. The resource-constrained project scheduling problem (RCPSP) is one of the most challenging...
In this paper we consider the resource-constrained project scheduling problem with multiple executio...
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatoria...
In this article, we present a parallel graphical processing unit (GPU)-based genetic algorithm (GA) ...
In this paper, the resource-constrained project scheduling problem with multiple execution modes for...
In this paper we present a genetic algorithm for the multi-mode resource-constrained project schedul...
In recent years, machine learning techniques, especially genetic programming (GP), have been a power...
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordi...
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling p...
A project scheduling problem investigates a set of activities that have to be scheduled due to prece...