We present a new heuristic for solving the resource-constrained project scheduling problem. The method is based on the iterative generation of subproblems, each one being solved by an exact method of a standard commercial tool. The good computational results on standard benchmark instances enlighten the practical interest of the approach
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during...
SIGLEAvailable from Bibliothek des Instituts fuer Weltwirtschaft, ZBW, D-21400 Kiel W 351 (469) / FI...
Highlights • Project staffing with discrete time/resource trade-offs and calendar constraints. • An ...
In this paper we consider the Project Scheduling Problem with resource constraints, where the object...
: In this paper we consider the Project Scheduling Problem with resource constraints, where the obje...
Abstract. In this paper we consider a well-known NP-hard resource constrained project scheduling pro...
In this study, a new heuristic approach to the resource constrained project scheduling problem is in...
Project management has become a widespread instrument enabling organizations to efficiently master t...
When the project is scheduled with a given set of resources, it is difficult to find the optimal sol...
Abstract We consider a novel generalization of the resource-constrained project scheduling problem (...
This paper proposes an iterative improvement approach for solving the Resource Constraint Project Sc...
We consider the resource-constrained project scheduling problem. The purpose of this paper is to dir...
This paper proposes a local search algorithm that makes use of a complex neighborhood relation based...
It is the purpose of this article to review the various solutions that have been proposed for the re...
This paper reports on results for the well-known resource-constrained project scheduling problem. A ...
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during...
SIGLEAvailable from Bibliothek des Instituts fuer Weltwirtschaft, ZBW, D-21400 Kiel W 351 (469) / FI...
Highlights • Project staffing with discrete time/resource trade-offs and calendar constraints. • An ...
In this paper we consider the Project Scheduling Problem with resource constraints, where the object...
: In this paper we consider the Project Scheduling Problem with resource constraints, where the obje...
Abstract. In this paper we consider a well-known NP-hard resource constrained project scheduling pro...
In this study, a new heuristic approach to the resource constrained project scheduling problem is in...
Project management has become a widespread instrument enabling organizations to efficiently master t...
When the project is scheduled with a given set of resources, it is difficult to find the optimal sol...
Abstract We consider a novel generalization of the resource-constrained project scheduling problem (...
This paper proposes an iterative improvement approach for solving the Resource Constraint Project Sc...
We consider the resource-constrained project scheduling problem. The purpose of this paper is to dir...
This paper proposes a local search algorithm that makes use of a complex neighborhood relation based...
It is the purpose of this article to review the various solutions that have been proposed for the re...
This paper reports on results for the well-known resource-constrained project scheduling problem. A ...
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during...
SIGLEAvailable from Bibliothek des Instituts fuer Weltwirtschaft, ZBW, D-21400 Kiel W 351 (469) / FI...
Highlights • Project staffing with discrete time/resource trade-offs and calendar constraints. • An ...