The RHIC Accelerating System runs at 26.7 MHz and is required to have an operating range of 85 kHz during the acceleration cycle. Since it also must provide sufficient range to cover manufacturing errors and temperature variation, a requirement of 300 kHz has been specified. A mechanical approach acting on the cavity accelerating gap has been chosen for financial reasons over a ferrite approach. A prototype has been constructed and fully tested on the existing test cavity, using the tuning loop feedback circuitry developed for this task. Results from both the loop response and the power tests of the prototype indicate that this design will successfully meet the performance requirements for the RHIC Accelerating Cavity. II. INTRODUCTION ...
A radiofrequency system consisting of 16 cavities, strongly coupled together by transmission line, i...
In the frame of the LHC Injector Upgrade program involving the existing 80 MHz cavities in the CERN ...
A phase-lock loop tune measurement system was commissioned during the RHIC2001 run. One meter long 5...
The RHIC Accelerating System runs at 26.7 MHz and is required to have an operating range of 85 kHz d...
The accelerating system for RHIC operates at 26.7 MHz (h=342) and must capture the injected beam, ac...
The ECX Project, Brookhaven Lab's predecessor to the RHIC e-Cooler, includes a prototype RF tun...
The 28 MHz accelerating system consists of a quarter wave cavity driven by an inductively coupled 10...
A 56 MHz Superconducting RF Cavity operating at 4.4K is being constructed for the RHIC collider. Thi...
Frequency tuning systems for accelerating cavities are required to compensate static and dynamic fre...
The superconducting CH multi-cell prototype cavity will be equipped with a frequency tuning system. ...
Fermilab is developing 325 MHz SRF spoke cavities for the proposed Project X. A compact fast/slow tu...
RF cavities are resonators and the key structures in particle accelerators. An electromagnetic field...
More than a dozen of spoke resonators prototypes (SSR, DSR, TSR) have been constructed and tested wo...
Preliminary phase-locked loop betatron tune measurement results were obtained during RHIC 2000 with ...
A system of ten rf cavities operating at 197 MHz will provide longitudinal focusing during beam stor...
A radiofrequency system consisting of 16 cavities, strongly coupled together by transmission line, i...
In the frame of the LHC Injector Upgrade program involving the existing 80 MHz cavities in the CERN ...
A phase-lock loop tune measurement system was commissioned during the RHIC2001 run. One meter long 5...
The RHIC Accelerating System runs at 26.7 MHz and is required to have an operating range of 85 kHz d...
The accelerating system for RHIC operates at 26.7 MHz (h=342) and must capture the injected beam, ac...
The ECX Project, Brookhaven Lab's predecessor to the RHIC e-Cooler, includes a prototype RF tun...
The 28 MHz accelerating system consists of a quarter wave cavity driven by an inductively coupled 10...
A 56 MHz Superconducting RF Cavity operating at 4.4K is being constructed for the RHIC collider. Thi...
Frequency tuning systems for accelerating cavities are required to compensate static and dynamic fre...
The superconducting CH multi-cell prototype cavity will be equipped with a frequency tuning system. ...
Fermilab is developing 325 MHz SRF spoke cavities for the proposed Project X. A compact fast/slow tu...
RF cavities are resonators and the key structures in particle accelerators. An electromagnetic field...
More than a dozen of spoke resonators prototypes (SSR, DSR, TSR) have been constructed and tested wo...
Preliminary phase-locked loop betatron tune measurement results were obtained during RHIC 2000 with ...
A system of ten rf cavities operating at 197 MHz will provide longitudinal focusing during beam stor...
A radiofrequency system consisting of 16 cavities, strongly coupled together by transmission line, i...
In the frame of the LHC Injector Upgrade program involving the existing 80 MHz cavities in the CERN ...
A phase-lock loop tune measurement system was commissioned during the RHIC2001 run. One meter long 5...