This research was aimed at determining the influence parameters have on the cut-off grade of sublevel stopes in the Garpenberg underground mine, and combing these to maximise value at the mine. Garpenberg is a multi-deposit poly-metallic mine owned by Boliden AB. Cost calculations were performed on data from 2018 to derive costs for each deposit and activity. Ore transport and rock bolting were two parameters which were suitable to be used for variable cost implementation. These costs were assigned to the different orebodies and cut-off grades were adjusted to reach a break-even level. Stopes were created using the Stope Optimizer software in Deswik, using the variable cut-offs and the technical constraints previously used for Garpenberg's ...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profita...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
Copyright © IMCET 2019 International Mining Congress and Exhibition of Turkey. All rights reserved.O...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
In current practice stope mines are designed using simple rules of thumb or using algorithms that do...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
Optimisation techniques for underground metalliferous mine design and planning are not commonplace l...
Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cuto...
The mining industry continues to face the problem of depleting grades and the subsequent significant...
A research report submitted to the Faculty of Engineering and the Built Environment, University of t...
A mine planning team is tasked among other duties with designing a feasible mine plan which in turn ...
The determination of optimum cutoff grade is influenced by the economic parameters (price of metal, ...
The stoping performance has a paramount effect on the economic viability of underground mining opera...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profita...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
Copyright © IMCET 2019 International Mining Congress and Exhibition of Turkey. All rights reserved.O...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
In current practice stope mines are designed using simple rules of thumb or using algorithms that do...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
Optimisation techniques for underground metalliferous mine design and planning are not commonplace l...
Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cuto...
The mining industry continues to face the problem of depleting grades and the subsequent significant...
A research report submitted to the Faculty of Engineering and the Built Environment, University of t...
A mine planning team is tasked among other duties with designing a feasible mine plan which in turn ...
The determination of optimum cutoff grade is influenced by the economic parameters (price of metal, ...
The stoping performance has a paramount effect on the economic viability of underground mining opera...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profita...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...