One of the features of S-LRS is that the injection and extraction system are placed in the same straight section. An electrostatic inflector (ESI) and an electrostatic deflector (ESD) are installed in the same vavuum chamber for the compactness. The ESI and the ESD were designed so as to bend the 7 MeV proton beam as large as 211 mrad. Now, the ESI is operted very stably with the high voltge of over 90 kV/cm. This paper describes the design of the electrostatic septum.conference pape
The ion storrage ring, S-LSR has an electron beam cooler and a laser cooling system, The electron c...
Abstract: Electrostatic separators will be used in the LEP Collider, presently under construction at...
At CERN, the SPS synchrotron is equipped with a slow extraction channel towards the fixed target bea...
At the end of September 2005, we completed the construction of S-LSR (Small Laser-equipped Storage R...
The electrostatic septum for the slow extraction system of the JHF 50-GeV proton synchrotron is one ...
The Low Energy Ion Ring (LEIR) transforms long pulses from Linac 3 into high brilliance ion bunches ...
For the MedAustron facility under construction in Wiener Neustadt, three electric field deflectors a...
The extraction system for the N-Area is located in LSS2 (another one for the W-Area, now abandoned, ...
In the Fermilab Tevatron Switchyard proton beam splits ae initiated by a wire array electrostatic se...
The design update of the European Spallation Source (ESS) accelerator is almost complete and the con...
The Large Hadron Collider required the modification of the existing extraction channel in the long s...
The Low Energy Ion Ring (LEIR) is part of the LHC injector chain for ions. The LEIR extraction will ...
revealed that after a certain time of operation, 15 minutes to a few hours depending on the accelera...
At ESRF, the European Synchrotron Radiation Facility in Grenoble, electrons are accelerated, via a 2...
The design of a compact all-permanent magnet electron cyclotron resonance (ECR) ion source injector ...
The ion storrage ring, S-LSR has an electron beam cooler and a laser cooling system, The electron c...
Abstract: Electrostatic separators will be used in the LEP Collider, presently under construction at...
At CERN, the SPS synchrotron is equipped with a slow extraction channel towards the fixed target bea...
At the end of September 2005, we completed the construction of S-LSR (Small Laser-equipped Storage R...
The electrostatic septum for the slow extraction system of the JHF 50-GeV proton synchrotron is one ...
The Low Energy Ion Ring (LEIR) transforms long pulses from Linac 3 into high brilliance ion bunches ...
For the MedAustron facility under construction in Wiener Neustadt, three electric field deflectors a...
The extraction system for the N-Area is located in LSS2 (another one for the W-Area, now abandoned, ...
In the Fermilab Tevatron Switchyard proton beam splits ae initiated by a wire array electrostatic se...
The design update of the European Spallation Source (ESS) accelerator is almost complete and the con...
The Large Hadron Collider required the modification of the existing extraction channel in the long s...
The Low Energy Ion Ring (LEIR) is part of the LHC injector chain for ions. The LEIR extraction will ...
revealed that after a certain time of operation, 15 minutes to a few hours depending on the accelera...
At ESRF, the European Synchrotron Radiation Facility in Grenoble, electrons are accelerated, via a 2...
The design of a compact all-permanent magnet electron cyclotron resonance (ECR) ion source injector ...
The ion storrage ring, S-LSR has an electron beam cooler and a laser cooling system, The electron c...
Abstract: Electrostatic separators will be used in the LEP Collider, presently under construction at...
At CERN, the SPS synchrotron is equipped with a slow extraction channel towards the fixed target bea...