The Central Arizona Water Conservation District is proposing to construct and operate the Superstition Mountains Recharge Project (SMRP) on Bureau of Reclamation (Reclamation) and Arizona State trust land in Pinal County, Arizona. Because construction and operation of a recharge project is not an operation and maintenance activity of the CAP covered under the 1987 Operation and Maintenance Transfer Contract, Reclamation intends to separately approve CAWCD's use of Reclamation land for this proposed project
In an effort to promote use of Arizona's CAP water entitlement, the Central Arizona Conservation Dis...
This final supplemental environmental assessment explores the potential impact of the proposed JTF-6...
This final environmental assessment explores the potential impact of the proposed fence, lighting, r...
SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expa...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
Document: Bureau of Reclamation, Central Arizona Project, 1963, author unknown, page 1BUREAU OF RECL...
The proposed Resolution Copper Mine at Oak Flat, Arizona is currently under review by the Environmen...
A draft environmental assessment to assess the potential impact of a proposed fence and improvement ...
"This Environmental Assessment (EA) describes the environmental effects of the proposed 100-year lea...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 46and would be t...
This final environmental assessment explores the potential impact of a Joint Task Force Six proposed...
As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Ener...
217 pages (PDF version). File size: 14.73 MB. Col. ill. Maps. Includes bibliographical references...
The final environmental assessment exploring the potential impact of the JTF-6 fence construction pr...
The Rural Abandoned Mine Program (RAMP) will help landowners develop and apply plans for the reclama...
In an effort to promote use of Arizona's CAP water entitlement, the Central Arizona Conservation Dis...
This final supplemental environmental assessment explores the potential impact of the proposed JTF-6...
This final environmental assessment explores the potential impact of the proposed fence, lighting, r...
SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expa...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
Document: Bureau of Reclamation, Central Arizona Project, 1963, author unknown, page 1BUREAU OF RECL...
The proposed Resolution Copper Mine at Oak Flat, Arizona is currently under review by the Environmen...
A draft environmental assessment to assess the potential impact of a proposed fence and improvement ...
"This Environmental Assessment (EA) describes the environmental effects of the proposed 100-year lea...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 46and would be t...
This final environmental assessment explores the potential impact of a Joint Task Force Six proposed...
As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Ener...
217 pages (PDF version). File size: 14.73 MB. Col. ill. Maps. Includes bibliographical references...
The final environmental assessment exploring the potential impact of the JTF-6 fence construction pr...
The Rural Abandoned Mine Program (RAMP) will help landowners develop and apply plans for the reclama...
In an effort to promote use of Arizona's CAP water entitlement, the Central Arizona Conservation Dis...
This final supplemental environmental assessment explores the potential impact of the proposed JTF-6...
This final environmental assessment explores the potential impact of the proposed fence, lighting, r...