A W-beam guardrail system was developed for attachment to the top slab of a low-fill concrete culvert. The guardrail design was constructed with a single, 2.66-mm-thick W-beam rail totaling 53.34 m in length. Over the culvert, W150x13.5 steel posts 946 mm long spaced 952.5 mm on center supported the W-beam rail. The research study included dynamic testing with a bogie vehicle and steel posts attached to a rigid foundation, computer simulation modeling with BARRIER VII, and two full-scale vehicle crash tests. The crash tests used three-quarter-ton pickup trucks and were conducted in accordance with the Test Level 3 (TL-3) requirements specified in National Cooperative Highway Research Program (NCHRP) Report 350: Recommended Procedures f...
PDFTech ReportTRP-03-310-14TPF-5(193) Supplement #56GuardrailsCulvertsFinite element methodHighway s...
The last decade has witnessed an increase in the number and speed of vehicles on the roads; these si...
Development, testing, and evaluation of the Midwest Guardrail System were continued from the origina...
PDFTech ReportTRP-03-277-14TPF-5(193) Supplement #32GuardrailsBeamsDynamic testsImpact testsBendingC...
A long-span guardrail for use over low-fill culverts was developed and successfully crash tested. T...
A W-beam guardrail system was developed and successfully crash tested for use on a 2:1 foreslope. T...
Long-span guardrail systems have been recognized as an effective means of shielding low-fill culvert...
7712581999Final Report 1999PDFTech ReportTRP-03-88-99SPR-3(017)Barrier free designCulvertsDegradatio...
A 7.62-m long span guardrail system was developed for use over low-fill culverts. The long span desi...
009214962001Final ReportPDFTech ReportTRP-03-105-00CurbsDesignGuardrail terminalsGuardrailsImpact te...
PDFTech ReportTRP-03-278-13TPF-5(193) Supplement Nos. 34 and 47CulvertsGuardrailsAnchoragesFillet we...
US Transportation Collection2020PDFTech ReportPajouh, Mojdeh AsadollahiBielenberg, Robert W.Rasmusse...
The objective of this study was to adapt and evaluate a weak-post, W-beam guardrail system for use w...
A steel post W-beam guardrail system was developed for installation in rock-soil foundations. The gu...
US Transportation Collection2000PDFOtherPolivka, Karla A.Faller, R.K.Sicking, D.L.Rohde, J. R.Reid, ...
PDFTech ReportTRP-03-310-14TPF-5(193) Supplement #56GuardrailsCulvertsFinite element methodHighway s...
The last decade has witnessed an increase in the number and speed of vehicles on the roads; these si...
Development, testing, and evaluation of the Midwest Guardrail System were continued from the origina...
PDFTech ReportTRP-03-277-14TPF-5(193) Supplement #32GuardrailsBeamsDynamic testsImpact testsBendingC...
A long-span guardrail for use over low-fill culverts was developed and successfully crash tested. T...
A W-beam guardrail system was developed and successfully crash tested for use on a 2:1 foreslope. T...
Long-span guardrail systems have been recognized as an effective means of shielding low-fill culvert...
7712581999Final Report 1999PDFTech ReportTRP-03-88-99SPR-3(017)Barrier free designCulvertsDegradatio...
A 7.62-m long span guardrail system was developed for use over low-fill culverts. The long span desi...
009214962001Final ReportPDFTech ReportTRP-03-105-00CurbsDesignGuardrail terminalsGuardrailsImpact te...
PDFTech ReportTRP-03-278-13TPF-5(193) Supplement Nos. 34 and 47CulvertsGuardrailsAnchoragesFillet we...
US Transportation Collection2020PDFTech ReportPajouh, Mojdeh AsadollahiBielenberg, Robert W.Rasmusse...
The objective of this study was to adapt and evaluate a weak-post, W-beam guardrail system for use w...
A steel post W-beam guardrail system was developed for installation in rock-soil foundations. The gu...
US Transportation Collection2000PDFOtherPolivka, Karla A.Faller, R.K.Sicking, D.L.Rohde, J. R.Reid, ...
PDFTech ReportTRP-03-310-14TPF-5(193) Supplement #56GuardrailsCulvertsFinite element methodHighway s...
The last decade has witnessed an increase in the number and speed of vehicles on the roads; these si...
Development, testing, and evaluation of the Midwest Guardrail System were continued from the origina...