Excavation by Tunnel Boring Machines is the tunnelling method most frequently used nowadays in long infrastructural projects, in a wide range of geological conditions. In the last 40 years, many prediction models were developed to estimate TBM performance and cutter wear, using as input geological parameters. The research gives an overview of the existing penetration models for hard rock TBMs, identifies the most frequently used input parameters and summarizes the characteristics of the datasets on which the models are based on. Theoretical background is tested through the example of Koralm tunnel project, a 32.9-km-long base tunnel in Austria, in a 1000-m-long portion of the South tube in the construction lot KAT 2. The outcomes shows that...
This paper focuses on performance analysis of Tunnel Boring Machine (in particular gripper TBMs) in ...
Tunnel projects with a length of several tens of kilometres, and generally consisting of double tube...
Explorative tunnels are one of the best ways to assess the rock quality in the preliminary stage of ...
Excavation by Tunnel Boring Machines is the tunnelling method most frequently used nowadays in long ...
The study takes into account different classes of tunnel boring machines (TBM), with the aim of iden...
Tunnel boring machine (TBM) performance prediction is often a critical issue in the early stage of a...
A new empirical formulation is presented which can be used to estimate the penetration-per-revolutio...
AbstractTunnel boring machine (TBM) performance prediction is often a critical issue in the early st...
The main purpose of the thesis work has been to improve the existing prediction models and to provid...
The prediction of the advance rate of a Tunnel Boring Machine (TBM) in hard rock conditions is one o...
In rock excavation engineering, cutting performance prediction plays an important role in machine an...
The knowledge of rock type and technology using for tunnel opening is essential for any mechanical e...
Abstract: Some of the most important aspects in the study of the fragmentation of rock due to the ac...
Since early 1980’s, research have been conducted on the prediction of tunnel boring machines (TBM) p...
The first phase of the Abu Hamour drainage and storm tunnel was completed in early 2017. The 9.5 km ...
This paper focuses on performance analysis of Tunnel Boring Machine (in particular gripper TBMs) in ...
Tunnel projects with a length of several tens of kilometres, and generally consisting of double tube...
Explorative tunnels are one of the best ways to assess the rock quality in the preliminary stage of ...
Excavation by Tunnel Boring Machines is the tunnelling method most frequently used nowadays in long ...
The study takes into account different classes of tunnel boring machines (TBM), with the aim of iden...
Tunnel boring machine (TBM) performance prediction is often a critical issue in the early stage of a...
A new empirical formulation is presented which can be used to estimate the penetration-per-revolutio...
AbstractTunnel boring machine (TBM) performance prediction is often a critical issue in the early st...
The main purpose of the thesis work has been to improve the existing prediction models and to provid...
The prediction of the advance rate of a Tunnel Boring Machine (TBM) in hard rock conditions is one o...
In rock excavation engineering, cutting performance prediction plays an important role in machine an...
The knowledge of rock type and technology using for tunnel opening is essential for any mechanical e...
Abstract: Some of the most important aspects in the study of the fragmentation of rock due to the ac...
Since early 1980’s, research have been conducted on the prediction of tunnel boring machines (TBM) p...
The first phase of the Abu Hamour drainage and storm tunnel was completed in early 2017. The 9.5 km ...
This paper focuses on performance analysis of Tunnel Boring Machine (in particular gripper TBMs) in ...
Tunnel projects with a length of several tens of kilometres, and generally consisting of double tube...
Explorative tunnels are one of the best ways to assess the rock quality in the preliminary stage of ...