To improve the accuracy of early forecasting the final cost at completion of an ongoing construction project, a new regression-based nonlinear cost estimate at completion (CEAC) methodology is proposed that integrates a growth model with earned schedule (ES) concepts. The methodology provides CEAC computations for project early-stage and middle-stage completion. To this end, this paper establishes three primary objectives, as follows: (1) develop a new formula based on integration of the ES method and four candidate growth models (logistic, Gompertz, Bass, andWeibull), (2) validate the new methodology through its application to nine past projects, and (3) select the equation with the best-performing growth model through testing their statis...
Forecasting the final cost based on Earned Value Management (EVM) data and managing cost contingency...
Projects in the construction industry struggle to meet set goals. This is especially true in long te...
Earned value management (EVM) was originally developed for cost management and has not widely been u...
Traditional Earned Value Management (EVM) index-based methods for Cost Estimate at Completion (CEAC)...
Accurate forecasting of a project’s Cost Estimate at Completion (CEAC) based on current performance ...
Reliable forecasting of the final cost at completion is one of the vital components of project monit...
Scope, Time and Cost are the three main attributes of a Project and they should be continuously moni...
Forecasting the final cost with Earned Value Management (EVM) and managing contingency budgets durin...
This work contributes to improving available methodologies for duration and cost estimates of ongoin...
Estimating duration and cost at completion based on Earned Value Management (EVM) data and managing ...
Synopsis A nonlinear regression-based growth model based on the Gompertz S-shaped function is used ...
This paper proposes a novel framework model that considers different behaviors of cost contingency (...
The ability to accurately forecast a project's final duration and cost is essential to successful pr...
AbstractEarned value management (EVM) was originally developed for cost management and has not widel...
Earned value management (EVM) has provided methods for predicting the final cost for projects. In la...
Forecasting the final cost based on Earned Value Management (EVM) data and managing cost contingency...
Projects in the construction industry struggle to meet set goals. This is especially true in long te...
Earned value management (EVM) was originally developed for cost management and has not widely been u...
Traditional Earned Value Management (EVM) index-based methods for Cost Estimate at Completion (CEAC)...
Accurate forecasting of a project’s Cost Estimate at Completion (CEAC) based on current performance ...
Reliable forecasting of the final cost at completion is one of the vital components of project monit...
Scope, Time and Cost are the three main attributes of a Project and they should be continuously moni...
Forecasting the final cost with Earned Value Management (EVM) and managing contingency budgets durin...
This work contributes to improving available methodologies for duration and cost estimates of ongoin...
Estimating duration and cost at completion based on Earned Value Management (EVM) data and managing ...
Synopsis A nonlinear regression-based growth model based on the Gompertz S-shaped function is used ...
This paper proposes a novel framework model that considers different behaviors of cost contingency (...
The ability to accurately forecast a project's final duration and cost is essential to successful pr...
AbstractEarned value management (EVM) was originally developed for cost management and has not widel...
Earned value management (EVM) has provided methods for predicting the final cost for projects. In la...
Forecasting the final cost based on Earned Value Management (EVM) data and managing cost contingency...
Projects in the construction industry struggle to meet set goals. This is especially true in long te...
Earned value management (EVM) was originally developed for cost management and has not widely been u...