The determination of optimum cutoff grade is influenced by the economic parameters (price of metal, mining and processing costs, etc.), the capacities of stages (mine, mill, and refinery) in the mining operation, and the grade distribution of the deposit. The cutoff grade changes with the influence of these parameters, sometimes widely, during the life of a mining operation. The theory of optimum cutoff grades is complex. However, this problem can be solved by the availability of algorithms, which could be implemented by the computer programs. This paper presents a cutoff grade optimization algorithm, which maximizes the Net Present Value (NPV) of the mining operation subject to mining, milling, and refining constraints. The benefits of the...
A number of high grade ores such as iron are sold at defined marketing grade specifications. The tra...
The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has...
This study presents a new mathematical model for cut-off grade and production scheduling optimisatio...
The determination of cutoff grade is influenced by the economic parameters (price of metal, mining, ...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cuto...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
Cut-off grade classifies the available supply of ore (valuable) and waste material within a minerali...
The work reported in this paper is part of a PhD research study at the University of the Witwatersra...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple pr...
Cut-off grade controls the movement of materials among mining, processing and refining stages of an ...
A mine planning team is tasked among other duties with designing a feasible mine plan which in turn ...
The mining complex refers to an integrated problem where the material is extracted from the mines; t...
A number of high grade ores such as iron are sold at defined marketing grade specifications. The tra...
The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has...
This study presents a new mathematical model for cut-off grade and production scheduling optimisatio...
The determination of cutoff grade is influenced by the economic parameters (price of metal, mining, ...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cuto...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
Cut-off grade classifies the available supply of ore (valuable) and waste material within a minerali...
The work reported in this paper is part of a PhD research study at the University of the Witwatersra...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple pr...
Cut-off grade controls the movement of materials among mining, processing and refining stages of an ...
A mine planning team is tasked among other duties with designing a feasible mine plan which in turn ...
The mining complex refers to an integrated problem where the material is extracted from the mines; t...
A number of high grade ores such as iron are sold at defined marketing grade specifications. The tra...
The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has...
This study presents a new mathematical model for cut-off grade and production scheduling optimisatio...