General feed forward controllers, conforming to standard control modes, have been derived for an activated sludge process. The analysis indicated that the appropriate controllers are proportional control with measurement of substrate flow rate, and derivative control with measurement of inlet substrate concentration, and manipulation of the rate of return sludge by both controllers. The performance of these controllers was tested by computer simulation of five dynamic aerator models with and without sludge storage, and with two settling basin models. In all cases significant reduction of the maximum exit substrate concentration was achieved. Additional improvement resulted from the use of sludge storage. As the aerator model became mor...
This paper presents an application regarding a model based predictive adaptive controller used to im...
A report is presented on a collaborative study of dynamic modelling and control of the activated slu...
(DTech (Electrical Engineering))--Cape Peninsula University of Technology, 2009.The problem for effe...
Material balances on substrate and microorganisms were derived in conjunction with various mixing co...
In spite of over two decades of development, dynamic models of the activated sludge process have enj...
The purpose of this investigation was to develop and validate at full-scale dynamic models and contr...
Proceedings of the 1991 Georgia Water Resources Conference, March 19-20, 1991, Athens, Georgia.An ap...
Studies and research in modeling and control tools of the biological wastewater treatment process is...
With the activated sludge wastewater treatment process being as complicated as it is, a concerted ef...
The objective of this study was to develop an integrated control strategy for the activated sludge p...
Thesis (MTech (Electrical Engineering))--Cape Peninsula University of Technology, 2009This project w...
This article describes the systematic design of a control structure for a biological wastewater trea...
In this paper, a feedforward-cascade controller for dissolved oxygen concentration in an activated s...
The activated sludge process is widely used throughout the world for the treatment of wastewater fro...
In this paper we present some of our experiences on the design and implementation of control systems...
This paper presents an application regarding a model based predictive adaptive controller used to im...
A report is presented on a collaborative study of dynamic modelling and control of the activated slu...
(DTech (Electrical Engineering))--Cape Peninsula University of Technology, 2009.The problem for effe...
Material balances on substrate and microorganisms were derived in conjunction with various mixing co...
In spite of over two decades of development, dynamic models of the activated sludge process have enj...
The purpose of this investigation was to develop and validate at full-scale dynamic models and contr...
Proceedings of the 1991 Georgia Water Resources Conference, March 19-20, 1991, Athens, Georgia.An ap...
Studies and research in modeling and control tools of the biological wastewater treatment process is...
With the activated sludge wastewater treatment process being as complicated as it is, a concerted ef...
The objective of this study was to develop an integrated control strategy for the activated sludge p...
Thesis (MTech (Electrical Engineering))--Cape Peninsula University of Technology, 2009This project w...
This article describes the systematic design of a control structure for a biological wastewater trea...
In this paper, a feedforward-cascade controller for dissolved oxygen concentration in an activated s...
The activated sludge process is widely used throughout the world for the treatment of wastewater fro...
In this paper we present some of our experiences on the design and implementation of control systems...
This paper presents an application regarding a model based predictive adaptive controller used to im...
A report is presented on a collaborative study of dynamic modelling and control of the activated slu...
(DTech (Electrical Engineering))--Cape Peninsula University of Technology, 2009.The problem for effe...