A bridge approach is usually built to provide a smooth and safe transition for vehicles from the roadway pavement to the bridge structure. However, differential settlement between the roadway pavement that rests on embankment fill and the bridge abutment built on more rigid foundation often creates a bump in the roadway. Previous work examined this issue at a microscopic level and presented new methods for eliminating or minimizing the effects at specific locations. This research studies the problem at a macroscopic level by determining methods to predict settlement severity; this assists designers in developing remediation plans during project development to minimize the lifecycle costs of bridge bump repairs. The study is based on histori...
A number of recently constructed bridge approach slabs using an articulation at mid span and the wid...
Bridge approach settlement problem is quite extensive in the U.S.A. This problem has been investigat...
941300PDFTech ReportKTC-02-18/SPR-220-00-1FBridge approachesSettlement (Structures)Bridge abutmentsC...
A bridge approach is usually built to provide a smooth and safe transition for vehicles from the roa...
016322532016Research ReportPDFTech ReportKTC-16 -23/SPR14-486-1FSPR 14-486Bridge approachesDifferent...
131 p.Over the past 20 years, extensive research has been conducted to study the causes and mitigati...
The report examines the cause of a differential settlement between the highway approach embankments ...
The nature and causes of the differential settlement between a bridge deck and the adjoining highway...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
Settlement at bridge approaches is a typical problem found between the end of the bridge and highway...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
Excessive differential settlement along bridge approach is commonly found in the lower central regio...
Bridge approach settlement is caused by the differential movements of the bridge abutment and the ap...
789840PDFResearch PaperVirginia. Dept. of TransportationHoppe, EJNTL-HIGHWAY/ROAD TRANSPORTATION-HIG...
Approach embankment settlement is a pervasive problem in Oklahoma and many other states. The bump an...
A number of recently constructed bridge approach slabs using an articulation at mid span and the wid...
Bridge approach settlement problem is quite extensive in the U.S.A. This problem has been investigat...
941300PDFTech ReportKTC-02-18/SPR-220-00-1FBridge approachesSettlement (Structures)Bridge abutmentsC...
A bridge approach is usually built to provide a smooth and safe transition for vehicles from the roa...
016322532016Research ReportPDFTech ReportKTC-16 -23/SPR14-486-1FSPR 14-486Bridge approachesDifferent...
131 p.Over the past 20 years, extensive research has been conducted to study the causes and mitigati...
The report examines the cause of a differential settlement between the highway approach embankments ...
The nature and causes of the differential settlement between a bridge deck and the adjoining highway...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
Settlement at bridge approaches is a typical problem found between the end of the bridge and highway...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
Excessive differential settlement along bridge approach is commonly found in the lower central regio...
Bridge approach settlement is caused by the differential movements of the bridge abutment and the ap...
789840PDFResearch PaperVirginia. Dept. of TransportationHoppe, EJNTL-HIGHWAY/ROAD TRANSPORTATION-HIG...
Approach embankment settlement is a pervasive problem in Oklahoma and many other states. The bump an...
A number of recently constructed bridge approach slabs using an articulation at mid span and the wid...
Bridge approach settlement problem is quite extensive in the U.S.A. This problem has been investigat...
941300PDFTech ReportKTC-02-18/SPR-220-00-1FBridge approachesSettlement (Structures)Bridge abutmentsC...