This report documents an investigation of water-related distress on portions of I 65 in Hardin County, Kentucky, on Muldraugh Hill. An open-graded surface placed on a full-depth asphaltic concrete pavement had shown areas of flushing and shallow shear failures in the outer lanes after one year of service. Cores were obtained from the outer lanes in areas exhibiting no problems to shear and flow failures. Core sites also were chosen across the lane to represent edge, wheel track, and between wheel track conditions. Visual inspection of the cores was made under normal lighting and an ultraviolet light and photographs were taken. Construction data and records indicated no abnormal construction problems. Results of laboratory density, extractio...
During construction of the southbound lanes of I 65, Stations 120+00 to 218+00, in Hardin County, Ke...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
This report summarizes the findings of a field investigation of the aggregate underdrain system cons...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
On August 14. 1989. the Kentucky Transportation Cabinet requested the Kentucky Transportation Center...
Laboratory analyses of a failed asphaltic concrete surface are presented. Construction procedures, m...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
The subject project was constructed in the fall of 1988. Soon after construction, the pavement began...
During construction of the southbound lanes of I 65, Stations 120+00 to 218+00, in Hardin County, Ke...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
This report summarizes the findings of a field investigation of the aggregate underdrain system cons...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
This report summarizes the construction and performance of a Cedergren-type underdrain system. Other...
On August 14. 1989. the Kentucky Transportation Cabinet requested the Kentucky Transportation Center...
Laboratory analyses of a failed asphaltic concrete surface are presented. Construction procedures, m...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
The subject project was constructed in the fall of 1988. Soon after construction, the pavement began...
During construction of the southbound lanes of I 65, Stations 120+00 to 218+00, in Hardin County, Ke...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...