The subject project was constructed in the fall of 1988. Soon after construction, the pavement began to deteriorate. Areas of alligator cracking were observed along with extensive rutting and pushing of the asphaltic concrete. Distresses occurred soon after the roadway was completed. Personnel of the Jefferson Co. Public Works Department requested that Kentucky Transportation Center (KTC) personnel make a preliminary inspection. Kentucky Transportation Center (KTC) personnel conducted preliminary tests at the site on July 11, 1989. Results of tests were outlined in a letter to Schimpeler-Corradino Associates, on July 19, 1989. After review, of those results, Schimpeler-Corradino principals requested that additional testing be performed. KTC...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
The Lexington-Fayette Urban County Government requested that the Kentucky Transportation Center perf...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report summarizes the findings of a field investigation of the aggregate underdrain system cons...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
A preliminary examination was made of the subject pavement on November 2, 1959, by James H. Havens a...
This series of inspections started April 28, with inspection of pavements containing gravel located ...
This series of inspections started April 28, with inspection of pavements containing gravel located ...
A preliminary examination was made of the subject pavement on November 2, 1959, by James H. Havens a...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...
The Lexington-Fayette Urban County Government requested that the Kentucky Transportation Center perf...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report discusses the investigation of the premature cracking that has been occurring on the Nat...
This report summarizes the findings of a field investigation of the aggregate underdrain system cons...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
A preliminary examination was made of the subject pavement on November 2, 1959, by James H. Havens a...
This series of inspections started April 28, with inspection of pavements containing gravel located ...
This series of inspections started April 28, with inspection of pavements containing gravel located ...
A preliminary examination was made of the subject pavement on November 2, 1959, by James H. Havens a...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
Personnel from the Kentucky Transportation Center performed a visual inspection of newly constructed...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
This report discusses the investigation of the premature cracking that occurred on the National Turn...
During the last week of August, Mr. J. S. Riley, Supervisory Construction Engineer, Area D, called o...