The hydraulic development of Cère II is an important engineering project, that is being exploited by EDF. It is situated in the Central Massif, a mountainous region, and its features naturally correspond to the terrain where it is located. The gallery is very long, and every effort has been made to achieve high rates of progress both in the drilling and facing work. The author discusses the machinery that was used, and the measures adopted to take the greatest possible advantage of this equipment. The description is particularly detailed in relation to problems encountered on meeting changes in the rock and ground through which the gallery was drilled. The rate of progress could be investigated in detail, since two separate contractors we...
The current titling project responds to an energy demand. The design of the derivation works of the...
This project was a "design of press hydraulic automatic for 300 tons with device extraction of beari...
El presente proyecto trata el diseño del sostenimiento y revestimiento del túnel de aducción de la C...
Issues 162 and 166 of «Informes de la Construcción» contain two articles on the installations and dr...
The drilling of underground tunnels involves a number of problems, depending on the type of rock and...
Maestría en Ingeniería CivilConocer los esfuerzos in-situ en un macizo rocoso, es un parámetro esenc...
The water from the rivers Pigüeña and Somiedo is collected and conducted to the Salto de Miranda hyd...
French engineers have designed and made the necessary machinery and equipment to develop a roadway n...
In civil engineering the drilling of underground galleries is a common occurrence, especially in hyd...
The first article of this series was published in issue N.° 162 of «Informes de la Construcción», un...
For the final line design of a pressure tunnel some factors must be taken into account to ensure it ...
The drilling rate and the trajectory of the wells under study will be evaluated based on the litholo...
The development of this degree project was carried out with the Colombian oil company Occidental, be...
The Campo Gustavo Galindo Velasco located in the province of Santa Elena, has begun to show signs of...
Con el pasar de los años el descubrimiento de nuevas reservas de hidrocarburos ha planteado diferent...
The current titling project responds to an energy demand. The design of the derivation works of the...
This project was a "design of press hydraulic automatic for 300 tons with device extraction of beari...
El presente proyecto trata el diseño del sostenimiento y revestimiento del túnel de aducción de la C...
Issues 162 and 166 of «Informes de la Construcción» contain two articles on the installations and dr...
The drilling of underground tunnels involves a number of problems, depending on the type of rock and...
Maestría en Ingeniería CivilConocer los esfuerzos in-situ en un macizo rocoso, es un parámetro esenc...
The water from the rivers Pigüeña and Somiedo is collected and conducted to the Salto de Miranda hyd...
French engineers have designed and made the necessary machinery and equipment to develop a roadway n...
In civil engineering the drilling of underground galleries is a common occurrence, especially in hyd...
The first article of this series was published in issue N.° 162 of «Informes de la Construcción», un...
For the final line design of a pressure tunnel some factors must be taken into account to ensure it ...
The drilling rate and the trajectory of the wells under study will be evaluated based on the litholo...
The development of this degree project was carried out with the Colombian oil company Occidental, be...
The Campo Gustavo Galindo Velasco located in the province of Santa Elena, has begun to show signs of...
Con el pasar de los años el descubrimiento de nuevas reservas de hidrocarburos ha planteado diferent...
The current titling project responds to an energy demand. The design of the derivation works of the...
This project was a "design of press hydraulic automatic for 300 tons with device extraction of beari...
El presente proyecto trata el diseño del sostenimiento y revestimiento del túnel de aducción de la C...