The Junior High School of which I have been Head for over fourteen years was, for many years, a girls' grammar school and as such had no facilities for the practical skills of woodwork and metalwork. When the school began to develop into a mixed 6 fe comprehensive school in 1971, we had no facilities at all for six months, then very basic provision for woodwork in one of the boys' new changing rooms. The following year we were able to offer both metalwork and woodwork in an adapted Music Room, but it was not until 1973 that the open-plan Design and Technical Studies block was ready for occupation.From that time the work began to develop as Design and Technical Studies, but still for boys only, but before long the Head of Department was begi...