In BOT approach, the private sector is granted a concession to plan, design, construct, operate and maintain a project in a certain period of time and after that it should be transferred to the government. In this paper, at first the risks of the BOT projects are identified, then we rank the risks based on their severity and effect on project objectives (time, cost, quality, safety and environmental) by two methods, namely FTOPSIS and FSAW. In the next stage, obtained results by NGT method are integrated. Afterward, the occurrence and detection values of each risk are determined by experts and ultimately the risks are evaluated according to risk priority number (RPN) of failure mode and effect analysis (FMEA) technique. Finally, an example ...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, ...
Abstract. Economic growth and development is the most important factor in the development of a count...
Large engineering projects embody a number of special aspects and unique characteristics in compari...
In BOT approach, the private sector is granted a concession to plan, design, construct, operate and ...
AbstractIn BOT approach, the private sector is granted a concession to plan, design, construct, oper...
The private sector has an important role on the development of cities, and governments are encouragi...
There are several risks in a BOT project. Major critical risks are total project cost and revenue/to...
Infrastructure projects, based on the Build-Operate-Transfer, (BOT), method, have been of interest t...
One of the issues that arises in BOT contracts are hazards and risks of the project. Governments ten...
BOT has been one of the recent innovation in project finance. The Build-Operate-Transfer (BOT) schem...
Successful implementation of build-operate-transfer, (BOT), infrastructure projects is dependent on ...
Infrastructure projects that have a major role in the financial development of countries have alread...
The growth of the infrastructure sector in India has been relatively slow compared to the industrial...
Build-Operate-Transfer (BOT) contracts have been widely implemented in developing countries facing b...
The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on pri...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, ...
Abstract. Economic growth and development is the most important factor in the development of a count...
Large engineering projects embody a number of special aspects and unique characteristics in compari...
In BOT approach, the private sector is granted a concession to plan, design, construct, operate and ...
AbstractIn BOT approach, the private sector is granted a concession to plan, design, construct, oper...
The private sector has an important role on the development of cities, and governments are encouragi...
There are several risks in a BOT project. Major critical risks are total project cost and revenue/to...
Infrastructure projects, based on the Build-Operate-Transfer, (BOT), method, have been of interest t...
One of the issues that arises in BOT contracts are hazards and risks of the project. Governments ten...
BOT has been one of the recent innovation in project finance. The Build-Operate-Transfer (BOT) schem...
Successful implementation of build-operate-transfer, (BOT), infrastructure projects is dependent on ...
Infrastructure projects that have a major role in the financial development of countries have alread...
The growth of the infrastructure sector in India has been relatively slow compared to the industrial...
Build-Operate-Transfer (BOT) contracts have been widely implemented in developing countries facing b...
The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on pri...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, ...
Abstract. Economic growth and development is the most important factor in the development of a count...
Large engineering projects embody a number of special aspects and unique characteristics in compari...