Collapsible soils are subjected to rapid changes in their volume when inundated with water. Collapse of such a soil deposit during construction of a cement plant in north Azerbaijan resulted in significant settlement and tilting of structures causing a 2 years delay in the construction. The investor had to bear the huge costs of delay and remediation works. The collapse susceptibility of the soil could not be identified during initial site investigations. After first indications of the collapse problem (tilting, cracking of structures) the settlements were measured at different locations for a long time and a new site investigation was executed. The results of these studies were utilized to determine the collapse potential of the soil. Int...