A photograph of the right rear corner of Springfield College's Beveridge Center, taken from the south. Also visible in the image to the left is the walkway connecting the Beveridge Center to Woods Hall.In March 1958, the partial demolition of Woods Hall and groundbreaking for the Beveridge Center, or BC as it was known to the campus community, began. The Beveridge Center, which replaced the old campus student union, was built as a place where students, faculty, and administration could gather in a warm and friendly atmosphere. The estimated total cost of the entire project was $425,000. The cornerstone laying ceremony took place on May 24, 1958 and on January 23, 1959, the official Dedication Ceremony for the building was held. The Bev...