Construction in a semi-conductor manufacturing facility involves the constant construction, demolition and modification of thousands of machines that enable raw silicon to be transformed to a wafer with over 1.4 billion transistors. While maintenance is always required to operate such large facilities, a majority of the construction follows a cyclical pattern of a two year cycle. The ability to handle the construction loads of over 3,000 machines in a 6-12 month period requires a specialized construction workforce that is able to meet the strict quality requirements of working in a class 1 cleanroom environment. Within a given construction ramp, the trade headcount can rise from hundreds to low thousands during the peak periods. Baseline sc...
A particular problem for productivity in engineering construction projects is poor front-end plannin...
In today’s construction, there is a paramount focus on time, and on the scheduling and control of ti...
Fast-tracking is an important process to speed the delivery of construction projects. To support opt...
“This research examines construction environments within manufacturing facilities, specifically semi...
Repetitive construction projects require construction crews to repeat their work in a number of loca...
This study adopts the flow shop concept used in industrial production to schedule repetitive non-lin...
Current socio-economic conditions impose certain requirements on construction and renovation project...
Construction schedule optimisation problems have been explored extensively, including activity seque...
The Factory Operations portion of the 2001 International Technology Roadmap for Semiconductors (ITRS...
none2siChair of the International Organizing Committee: Dr. Miklós Hajdu (Budapest University of Tec...
Reducing the time of production within maintaining the cost of the final product is the main issue i...
The article analyzes the instability causes of construction and assembly works (CAW) schedules which...
The article considers potentially possible optimization solutions in scheduling while forming the an...
Industrial system infrastructure installations, such as those in semiconductor fabrication plants, a...
Thesis (Ph.D.)--University of Washington, 2019Prefabrication and modularization are a growing trend ...
A particular problem for productivity in engineering construction projects is poor front-end plannin...
In today’s construction, there is a paramount focus on time, and on the scheduling and control of ti...
Fast-tracking is an important process to speed the delivery of construction projects. To support opt...
“This research examines construction environments within manufacturing facilities, specifically semi...
Repetitive construction projects require construction crews to repeat their work in a number of loca...
This study adopts the flow shop concept used in industrial production to schedule repetitive non-lin...
Current socio-economic conditions impose certain requirements on construction and renovation project...
Construction schedule optimisation problems have been explored extensively, including activity seque...
The Factory Operations portion of the 2001 International Technology Roadmap for Semiconductors (ITRS...
none2siChair of the International Organizing Committee: Dr. Miklós Hajdu (Budapest University of Tec...
Reducing the time of production within maintaining the cost of the final product is the main issue i...
The article analyzes the instability causes of construction and assembly works (CAW) schedules which...
The article considers potentially possible optimization solutions in scheduling while forming the an...
Industrial system infrastructure installations, such as those in semiconductor fabrication plants, a...
Thesis (Ph.D.)--University of Washington, 2019Prefabrication and modularization are a growing trend ...
A particular problem for productivity in engineering construction projects is poor front-end plannin...
In today’s construction, there is a paramount focus on time, and on the scheduling and control of ti...
Fast-tracking is an important process to speed the delivery of construction projects. To support opt...