In mechanized tunneling, due to the TBM shield’s advance, an empty annular space remains behind the segment, which often filled with pea gravel and cement grout. Since about 90% of rock displacement occurs after boring at a short distance from the tunnel’s face, contact grouting creates a proper substrate for installed segments and prevents stepping between them. The filling between the segments and the tunnel’s wall will provide a uniformly distributed load on the segments and will increase the load bearing capacity of the concrete lining, minimize the level of ground settlement, prevent the distortion of the concrete rings, and reduce the amount of water leakage into the tunnel. Often there is no definite way to implement contact grouting...
In the mechanized tunnelling with Tunnel Boring Machines (TBM), the filling process of the tail void...
In order to solve the problem that the hole-forming rate of boreholes is low and it is difficult to ...
In shielded mechanized tunneling, the annular gap caused due to the Tunnel boring machine (TBM) driv...
In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused...
In tunnel construction in hard rock, a common method to reduce water inflow is to perform pre-grouti...
Shield tunnels are vulnerable to large displacements induced by surrounding environmental changes. G...
At the rear of a tunnel-boring machine (TBM), the tail void - the annular space between the concrete...
In shielded mechanized tunneling, the annular gap caused due to the Tunnel boring machine (TBM) driv...
The first stage of the Istanbul metro construction was conducted in sandstone and mudstones of Carbo...
Abstract The grouting results for a tunnel at a depth of 450 m in crystalline rock at Äspö HRL were ...
An extensive field test was conducted in spring 2005 in the Törnskog Tunnel and consisted of design,...
Grouting can effectively seal and reinforce broken rock masses in deep geotechnical engineering, whi...
Mechanized tunnel construction in soft ground has evolved significantly over the last 20 years, espe...
Due to growth of the population in cities and limited space there is an increasing trend to move tra...
Groundwater can cause many hazardous problems when a tunnel is excavating. Seepage force acting on t...
In the mechanized tunnelling with Tunnel Boring Machines (TBM), the filling process of the tail void...
In order to solve the problem that the hole-forming rate of boreholes is low and it is difficult to ...
In shielded mechanized tunneling, the annular gap caused due to the Tunnel boring machine (TBM) driv...
In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused...
In tunnel construction in hard rock, a common method to reduce water inflow is to perform pre-grouti...
Shield tunnels are vulnerable to large displacements induced by surrounding environmental changes. G...
At the rear of a tunnel-boring machine (TBM), the tail void - the annular space between the concrete...
In shielded mechanized tunneling, the annular gap caused due to the Tunnel boring machine (TBM) driv...
The first stage of the Istanbul metro construction was conducted in sandstone and mudstones of Carbo...
Abstract The grouting results for a tunnel at a depth of 450 m in crystalline rock at Äspö HRL were ...
An extensive field test was conducted in spring 2005 in the Törnskog Tunnel and consisted of design,...
Grouting can effectively seal and reinforce broken rock masses in deep geotechnical engineering, whi...
Mechanized tunnel construction in soft ground has evolved significantly over the last 20 years, espe...
Due to growth of the population in cities and limited space there is an increasing trend to move tra...
Groundwater can cause many hazardous problems when a tunnel is excavating. Seepage force acting on t...
In the mechanized tunnelling with Tunnel Boring Machines (TBM), the filling process of the tail void...
In order to solve the problem that the hole-forming rate of boreholes is low and it is difficult to ...
In shielded mechanized tunneling, the annular gap caused due to the Tunnel boring machine (TBM) driv...