The ground improvement performed at the site of two 190-ft (57.9 m) diameter, 40-ft (12.2 m) high, 8 million-gallon (30,300 m3), circular steel water storage tanks consisted of installation of stone columns to mitigate liquefaction and lateral spreading potential and a surcharge program to reduce post-construction settlements. Settlement during the surcharge program ranged between 9 and 15 in. (225 and 375 mm) and post-construction settlement during the hydrotest was about 1.2 inches (305 mm)
A case history of evaluation and remediation of an existing slope supporting two 15,000-gallon under...
An overhead tank of 200 KL capacity and 9 m staging was constructed in year 1975 at the ancient hist...
Palm Jumeira is a reclaimed island off the coast of Dubai. While almost all heavy structures built o...
Two SPTs and two CPTs for ground before and after stabilization, three static loading tests for the ...
This paper describes the construction of four large tanks on poor soil conditions consisting of hydr...
The paper presents a detailed case history of foundation performance of six 60-m diameter, 15-m high...
This case study describes the use of ground improvement to treat a highly variable site, where new o...
This paper presents the design and construction of compaction grouting work completed for a tank rep...
Foundations of 8 Steel Oil storage tanks and two fire water tanks were proportioned limiting total s...
This article describes the design, quality control and performance of vibroreplacement stone columns...
For a large scale expansion of an existing wastewater treatment plant in Virginia, constructing shal...
Storage tanks for a wastewater treatment plant were stage-loaded on weak compressible fine-grained s...
Three 30,000m3 storage tanks are located at a hydraulic-filled reclamation site and close to an eart...
A soil improvement program revealed new dimensions of rate of pore pressure dissipation, settlement,...
The paper discusses studies undertaken to identify the cause(s) for differential settlements experie...
A case history of evaluation and remediation of an existing slope supporting two 15,000-gallon under...
An overhead tank of 200 KL capacity and 9 m staging was constructed in year 1975 at the ancient hist...
Palm Jumeira is a reclaimed island off the coast of Dubai. While almost all heavy structures built o...
Two SPTs and two CPTs for ground before and after stabilization, three static loading tests for the ...
This paper describes the construction of four large tanks on poor soil conditions consisting of hydr...
The paper presents a detailed case history of foundation performance of six 60-m diameter, 15-m high...
This case study describes the use of ground improvement to treat a highly variable site, where new o...
This paper presents the design and construction of compaction grouting work completed for a tank rep...
Foundations of 8 Steel Oil storage tanks and two fire water tanks were proportioned limiting total s...
This article describes the design, quality control and performance of vibroreplacement stone columns...
For a large scale expansion of an existing wastewater treatment plant in Virginia, constructing shal...
Storage tanks for a wastewater treatment plant were stage-loaded on weak compressible fine-grained s...
Three 30,000m3 storage tanks are located at a hydraulic-filled reclamation site and close to an eart...
A soil improvement program revealed new dimensions of rate of pore pressure dissipation, settlement,...
The paper discusses studies undertaken to identify the cause(s) for differential settlements experie...
A case history of evaluation and remediation of an existing slope supporting two 15,000-gallon under...
An overhead tank of 200 KL capacity and 9 m staging was constructed in year 1975 at the ancient hist...
Palm Jumeira is a reclaimed island off the coast of Dubai. While almost all heavy structures built o...