A gravel storage building and distribution facility was planned for construction at the West Parr yard located in the Port of Richmond, California. The general subsurface profile consists of a fill layer overlying a lens of young bay mud, a soft to med stiff silty clay and clayey silt. Below that lied a deeper dense clayey sand and stiff clay layer. The ground water table elevation observed in borings was approximately 7 to 10 feet below the current ground surface. Loads in excess of 3,500 psf would be applied to these strata and relatively tight settlements tolerances were necessitated to maintain functionality of the building’s conveyor systems. Deep pile foundations were considered but due to the excessive costs and operational challenge...
For a large scale expansion of an existing wastewater treatment plant in Virginia, constructing shal...
At the sheet wharf of Chazan port the large suffusional caverns and areas of loosy soil had been for...
This paper describes the geotechnical experience gained over the last 25 years at a 21-square kilome...
An 18-story reinforced concrete building under construction in South Florida reached 16th floor leve...
This paper presents a several case histories of jet grouting for the slope protection on soft soil. ...
Removal of contaminated soil underneath existing structures causes settlement. There is a need for a...
A proposed subway project is located in an area marked by a number of soft clay layers situated at d...
Construction of a powerhouse on unconsolidated landslide debris materials at the edge of a stream ch...
The characteristics of peaty soils that are widely recognized include their high compressibilit...
As part of a new cogeneration plant being built in Jacksonville, Florida, a 31-foot deep excavation ...
At the La Rosita Power Plant site in Mexicali, Mexico, a 3-m thick layer of loose very fine sandy si...
We were faced with an extraordinary geotechnical challenge; our client wanted to support large tilt ...
This is a report of results of applying four innovative grouting materials and one commercially avai...
An extensive soil improvement program was developed for the Vultri Container Terminal, Italy, locate...
A support Pier (Pier 161) for a Light Rail line being constructed for the Metro Manila Light Rail Pr...
For a large scale expansion of an existing wastewater treatment plant in Virginia, constructing shal...
At the sheet wharf of Chazan port the large suffusional caverns and areas of loosy soil had been for...
This paper describes the geotechnical experience gained over the last 25 years at a 21-square kilome...
An 18-story reinforced concrete building under construction in South Florida reached 16th floor leve...
This paper presents a several case histories of jet grouting for the slope protection on soft soil. ...
Removal of contaminated soil underneath existing structures causes settlement. There is a need for a...
A proposed subway project is located in an area marked by a number of soft clay layers situated at d...
Construction of a powerhouse on unconsolidated landslide debris materials at the edge of a stream ch...
The characteristics of peaty soils that are widely recognized include their high compressibilit...
As part of a new cogeneration plant being built in Jacksonville, Florida, a 31-foot deep excavation ...
At the La Rosita Power Plant site in Mexicali, Mexico, a 3-m thick layer of loose very fine sandy si...
We were faced with an extraordinary geotechnical challenge; our client wanted to support large tilt ...
This is a report of results of applying four innovative grouting materials and one commercially avai...
An extensive soil improvement program was developed for the Vultri Container Terminal, Italy, locate...
A support Pier (Pier 161) for a Light Rail line being constructed for the Metro Manila Light Rail Pr...
For a large scale expansion of an existing wastewater treatment plant in Virginia, constructing shal...
At the sheet wharf of Chazan port the large suffusional caverns and areas of loosy soil had been for...
This paper describes the geotechnical experience gained over the last 25 years at a 21-square kilome...