In July 1991, the intake and discharge pipelines of a major power plant collapsed. A 60-ft. deep excavation adjacent to several structures sensitive to ground movements was required- for remediation. Based on conventional analyses, the estimated factor of safety against base heave was close to 1. 0 for the required excavation, and there was grave concern for damage to appurtenant structures. A viable reconstruction scheme was developed through the integration of finite element analyses and construction monitoring
Construction of a 21-foot wide, 28-foot deep braced excavation in Detroit soft clays has been comple...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
A case history and analysis are presented of a 76-foot deep braced excavation in competent silt- and...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
Ground distresses such as ground settlement/subsidence, lateral movement, cracking, etc, are usually...
As part of a new cogeneration plant being built in Jacksonville, Florida, a 31-foot deep excavation ...
A 16m deep sheeted excavation failed by piping of the base. The sequence of events leading to this f...
The settlement experienced at a recently licensed nuclear station demonstrated the need for coordina...
This paper presents the design criteria, finite element modeling and actual behavior of a braced she...
CESP\u27s divers team found several basalt blocks scattered on the stilling basin of a power plant. ...
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineerin...
Excavation of 75m of claystone at Asco Unit II resulted in foundation heave in excess of anticipated...
A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experi...
Accurate monitoring of settlement beneath the main structures of a nuclear power plant not only demo...
Temporary tied anchor retaining walls have been used extensively where deep excavations are required...
Construction of a 21-foot wide, 28-foot deep braced excavation in Detroit soft clays has been comple...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
A case history and analysis are presented of a 76-foot deep braced excavation in competent silt- and...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
Ground distresses such as ground settlement/subsidence, lateral movement, cracking, etc, are usually...
As part of a new cogeneration plant being built in Jacksonville, Florida, a 31-foot deep excavation ...
A 16m deep sheeted excavation failed by piping of the base. The sequence of events leading to this f...
The settlement experienced at a recently licensed nuclear station demonstrated the need for coordina...
This paper presents the design criteria, finite element modeling and actual behavior of a braced she...
CESP\u27s divers team found several basalt blocks scattered on the stilling basin of a power plant. ...
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineerin...
Excavation of 75m of claystone at Asco Unit II resulted in foundation heave in excess of anticipated...
A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experi...
Accurate monitoring of settlement beneath the main structures of a nuclear power plant not only demo...
Temporary tied anchor retaining walls have been used extensively where deep excavations are required...
Construction of a 21-foot wide, 28-foot deep braced excavation in Detroit soft clays has been comple...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
A case history and analysis are presented of a 76-foot deep braced excavation in competent silt- and...