The concrete cut off wall is usually used to control the seepage through the foundation of earth dams. It is usually made of plastic concrete. It can be connected to the core of the earth dam using different connection systems. The difference between cut off wall and core material results stress concentration in the connection zone. In fact the main cause is the large difference between stiffness of the cut off wall concrete and clayey core of the dam. This makes the stress-strain behavior complex in the connection zone. In the present study, six different details for the connection system of the cut off wall to the earth dam core were identified. The Karkheh storage dam in Iran with a plastic concrete cut off wall was selected as the case ...
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall ...
In the article the authors analyze numerical modeling results of the stress-strain state of a combin...
In this paper, numerical analyses have been performed on the Karkheh embankment dam with a clayey co...
Seepage and water flow is one of the most important factors in design of embankment dams. The seepag...
Seepage through foundation of earth dams can be controlled using concrete cut off walls. The increas...
Seepage and flow of water in the soil is one of the most important issue and effective elements in d...
Copyright © The Author(s) 2018. Construction of a dam cut-off wall is one of the most challenging ta...
Water seepage is one of the most important features of embankment dams. To prevent and reduce seepag...
Seepage under dams can result in high uplift pressure experienced usually under the downstream of th...
Subject: the dam of compound design in which the water pressure is borne mutually by a concrete grav...
Seepage is one of the most substantial factors in the embankment dams design. The Cutoff wall method...
Since the construction of dam is significantly important both according to economic and safety aspec...
Coquitlam Dam, constructed in the early 1910s, is a 30 m high hydraulic fill embankment. The dam is ...
Seepage under dams can result in high uplift pressure experienced usually under the downstream of th...
The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present,...
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall ...
In the article the authors analyze numerical modeling results of the stress-strain state of a combin...
In this paper, numerical analyses have been performed on the Karkheh embankment dam with a clayey co...
Seepage and water flow is one of the most important factors in design of embankment dams. The seepag...
Seepage through foundation of earth dams can be controlled using concrete cut off walls. The increas...
Seepage and flow of water in the soil is one of the most important issue and effective elements in d...
Copyright © The Author(s) 2018. Construction of a dam cut-off wall is one of the most challenging ta...
Water seepage is one of the most important features of embankment dams. To prevent and reduce seepag...
Seepage under dams can result in high uplift pressure experienced usually under the downstream of th...
Subject: the dam of compound design in which the water pressure is borne mutually by a concrete grav...
Seepage is one of the most substantial factors in the embankment dams design. The Cutoff wall method...
Since the construction of dam is significantly important both according to economic and safety aspec...
Coquitlam Dam, constructed in the early 1910s, is a 30 m high hydraulic fill embankment. The dam is ...
Seepage under dams can result in high uplift pressure experienced usually under the downstream of th...
The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present,...
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall ...
In the article the authors analyze numerical modeling results of the stress-strain state of a combin...
In this paper, numerical analyses have been performed on the Karkheh embankment dam with a clayey co...