Two case histories are presented for earth retention structures where the results of construction monitoring were used to verify key criteria used for the design of the structures. One case history consists of a sheet-pile bulkhead structure for the unloading of bulk aggregate products in Bay City, Michigan. The front wall of the sheet-pile bulkhead was analyzed for heavy surcharge pressures from the adjacent aggregate stockpiles. The sheet-piles are laterally supported by sheet-pile deadman and tierods. Slope indicator tubes were used to monitor lateral movements next to the sheet-piles. The results from the slope indicators were then used to verify the stability of the bulkhead under the heavy surcharge loads from the aggregate stockpiles...
The design, construction, and performance of several building foundations and temporary earth retain...
Ground distresses such as ground settlement/subsidence, lateral movement, cracking, etc, are usually...
This paper discusses the geotechnical investigation of a large gold tailings facility which has been...
This paper describes a case study of a Retained Earth system constructed for the on- and off-ramps o...
The design and performance of the earth retention system for a 35 ft deep excavation in medium clay ...
This paper presents the design criteria, finite element modeling and actual behavior of a braced she...
Temporary tied anchor retaining walls have been used extensively where deep excavations are required...
Construction of a 21-foot wide, 28-foot deep braced excavation in Detroit soft clays has been comple...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
Heavily instrumented dams are unusual in the Midwestern United States. Council Bluff Dam, Missouri, ...
Time and environmental constraints necessitated the development of unique methods for building earth...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
In the observational method, gaps in the available information are filled by observations. Such obse...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
In July 1991, the intake and discharge pipelines of a major power plant collapsed. A 60-ft. deep exc...
The design, construction, and performance of several building foundations and temporary earth retain...
Ground distresses such as ground settlement/subsidence, lateral movement, cracking, etc, are usually...
This paper discusses the geotechnical investigation of a large gold tailings facility which has been...
This paper describes a case study of a Retained Earth system constructed for the on- and off-ramps o...
The design and performance of the earth retention system for a 35 ft deep excavation in medium clay ...
This paper presents the design criteria, finite element modeling and actual behavior of a braced she...
Temporary tied anchor retaining walls have been used extensively where deep excavations are required...
Construction of a 21-foot wide, 28-foot deep braced excavation in Detroit soft clays has been comple...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
Heavily instrumented dams are unusual in the Midwestern United States. Council Bluff Dam, Missouri, ...
Time and environmental constraints necessitated the development of unique methods for building earth...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
In the observational method, gaps in the available information are filled by observations. Such obse...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
In July 1991, the intake and discharge pipelines of a major power plant collapsed. A 60-ft. deep exc...
The design, construction, and performance of several building foundations and temporary earth retain...
Ground distresses such as ground settlement/subsidence, lateral movement, cracking, etc, are usually...
This paper discusses the geotechnical investigation of a large gold tailings facility which has been...