The pumping sump for the Petacalco, Gro. Power Plant required for its construction an excavation 100 x 87 m plan and 11 m depth. The calculated flow towards the excavation was 370 l/s. Two perimetral systems were proposed to control the inflow water: Cut-off wall or conventional pumping system. After a technical-economical analysis, the first one was selected. Due to construction delays of the cut-off wall and program construction demands, the excavation began simultaneously and advanced faster than the wall. The observed inflow water was ten times lesser than the predicted one, so that the construction of the wall was suspended. The excavation finished using a 6 diameter pump working continuously with a 35 l/s flow. During the excavation ...
Room Q is a 109-m-long cylindrical excavation in the Salado Formation at the Waste Isolation Pilot P...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
TOOBA deep excavation project was conducted in a densely developed area in the North West of Tehran,...
The paper describes, one of the typical cases in the construction of subterrain works in the city of...
In the archaeological region named Mesoamerica, there are cases of underground excavations for diffe...
After selection of the site for this major hydroelectric project on the Upper Parana River, initial ...
The slope instability that endangered seriously the powerhouse of the Aqua Prieta Hydroelectric Proj...
Ground expansion and finally sliding occurred in one corner of the 25 m deep open excavation for the...
At the La Rosita Power Plant site in Mexicali, Mexico, a 3-m thick layer of loose very fine sandy si...
Deep excavations in aquifers may be constructed by combining pumping with the cut and cover method. ...
In July 1991, the intake and discharge pipelines of a major power plant collapsed. A 60-ft. deep exc...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
The main dam at the Bighorn development consists of a zoned earthfill embankment with a concrete cut...
28.0 m high zoned Rarem dam in Indonesia was instrumented with hydraulic piezometers, electrical Car...
CESP\u27s divers team found several basalt blocks scattered on the stilling basin of a power plant. ...
Room Q is a 109-m-long cylindrical excavation in the Salado Formation at the Waste Isolation Pilot P...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
TOOBA deep excavation project was conducted in a densely developed area in the North West of Tehran,...
The paper describes, one of the typical cases in the construction of subterrain works in the city of...
In the archaeological region named Mesoamerica, there are cases of underground excavations for diffe...
After selection of the site for this major hydroelectric project on the Upper Parana River, initial ...
The slope instability that endangered seriously the powerhouse of the Aqua Prieta Hydroelectric Proj...
Ground expansion and finally sliding occurred in one corner of the 25 m deep open excavation for the...
At the La Rosita Power Plant site in Mexicali, Mexico, a 3-m thick layer of loose very fine sandy si...
Deep excavations in aquifers may be constructed by combining pumping with the cut and cover method. ...
In July 1991, the intake and discharge pipelines of a major power plant collapsed. A 60-ft. deep exc...
A deep internally braced excavation in soft clay was performed for a pump station at a sewage treatm...
The main dam at the Bighorn development consists of a zoned earthfill embankment with a concrete cut...
28.0 m high zoned Rarem dam in Indonesia was instrumented with hydraulic piezometers, electrical Car...
CESP\u27s divers team found several basalt blocks scattered on the stilling basin of a power plant. ...
Room Q is a 109-m-long cylindrical excavation in the Salado Formation at the Waste Isolation Pilot P...
An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical buil...
TOOBA deep excavation project was conducted in a densely developed area in the North West of Tehran,...