This paper briefs design considerations, construction methods and materials, static load test results and pile integrity test results of the cast in-situ bored piles constructed as foundation elements for a wastewater treatment plant. The treatment plant is located in Bangkok, capital of the Kingdom of Thailand and is to serve about 195,000 inhabitants of the city. A total of 402 piles, 296 nos. of 1500 mm diameter and 96 nos. of 1000 mm diameter, were designed to carry the whole structural load of the treatment plant. Maximum working load on individual piles was designed to be 1000 tons and 500 tons for 1500 mm and 1000 nun diameter pile respectively with a safety factor of 2.5. Initially the pile toe depth was designed to be 60m below the...
The paper describes the inadequacies of cycled head-down load tests on two barrettes and one bored p...
Piles in Bombay region are bored cast-in-situ installed by bailor and chisel boring or direct mud ci...
The termination depth of bored cast in situ piles poses serious problem to the field engineers parti...
The major part of Bangladesh is formed of young fluvio-deltaic sedimentary deposits, laid down by th...
A Thesis submitted to the Department of Civil Engineering for the Degree of Master of Engineering in...
Bored concrete piles have been used widely on commercial developments in London for about the last 5...
Economy, reliability and amount of information gathered from post construction quality control load ...
A pile driving and testing program was undertaken to evaluate installation procedures, assess capaci...
The foundation of the terminal in the Second Bangkok International Airport consists of over 25,000 b...
In practice, inappropriate test set-up and design will result in pile eccentricity, reducing pile be...
Eleven pile load tests were reviewed and analyzed to document the issues related to the design and l...
Taman Melati Yogyakarta Apartment Project located on Prof. Dr. Sardjito No. 66 road, Terban Gondokus...
This paper presents the development of geotechnical maps in Nakhon Ratchasima municipality, Nakhon R...
The level of infrastructure development Qatar has accomplished over the past 10 years has not been r...
Sonic integrity testing is a common method used to test the integrity of piles in Bangkok. An acoust...
The paper describes the inadequacies of cycled head-down load tests on two barrettes and one bored p...
Piles in Bombay region are bored cast-in-situ installed by bailor and chisel boring or direct mud ci...
The termination depth of bored cast in situ piles poses serious problem to the field engineers parti...
The major part of Bangladesh is formed of young fluvio-deltaic sedimentary deposits, laid down by th...
A Thesis submitted to the Department of Civil Engineering for the Degree of Master of Engineering in...
Bored concrete piles have been used widely on commercial developments in London for about the last 5...
Economy, reliability and amount of information gathered from post construction quality control load ...
A pile driving and testing program was undertaken to evaluate installation procedures, assess capaci...
The foundation of the terminal in the Second Bangkok International Airport consists of over 25,000 b...
In practice, inappropriate test set-up and design will result in pile eccentricity, reducing pile be...
Eleven pile load tests were reviewed and analyzed to document the issues related to the design and l...
Taman Melati Yogyakarta Apartment Project located on Prof. Dr. Sardjito No. 66 road, Terban Gondokus...
This paper presents the development of geotechnical maps in Nakhon Ratchasima municipality, Nakhon R...
The level of infrastructure development Qatar has accomplished over the past 10 years has not been r...
Sonic integrity testing is a common method used to test the integrity of piles in Bangkok. An acoust...
The paper describes the inadequacies of cycled head-down load tests on two barrettes and one bored p...
Piles in Bombay region are bored cast-in-situ installed by bailor and chisel boring or direct mud ci...
The termination depth of bored cast in situ piles poses serious problem to the field engineers parti...