The Sardar Sarovar (Narmada) underground powerhouse is located in Deccan Basalt flows in the lower Narmada valley in Gujarat state. These flows are intruded by dolerite dykes and sill. Basalt flows and dolerite rocks are considered good tunneling media for locating underground structures. Therefore, initial designing of supports was done considering good rock mass conditions. However, during construction numerous geotechnical problems were encountered necessitating review of support system. Rock falls and collapses were observed in tunnel sections passing through dolerite dykes and sills. Cracks were observed in the walls of the powerhouse cavern. During progressive excavations back analysis was done to know the causes of distress in rock m...
The geotechnical investigations play an important role in economic viability and structural stabilit...
Tunnels have been built since 2180 B.C., through the stone age. They became popular worldwide since ...
One of the main concerns in underground rock construction is the complexity and uncertainty of the g...
The Sardar Sarovar (Narmada) Project, Gujarat State envisages the construction of an underground pow...
Geotechnical evaluation of the 163 m high concrete gravity Sardar Sarovar (Narmada) dam, under const...
Support requirements for two caverns arc worked out by empirical and the numerical approaches. The a...
Reported case history of Himalayan tunnel reveals that Barton\u27s and Bieniawski\u27s classificatio...
The Karjan dam is located on the Deccan Basalt flows of Cretaceous - Eocene age in the Narmada valle...
Construction of a 23m wide, 57m high, and 210m long underground power house cavern is in progress as...
AbstractA 12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel borin...
Varahi river in Karnataka State, India originates on the Western Ghats and is harnessed for power ge...
Two earth and boulder fill dams of height 127.6 m and 72.2 m are major structures of Ramganga River ...
Since early sixties numerous tunnels had been planned and constructed for hydro-electric power gener...
Geotechnical assessment of the foundation including engineering geological investigations are essent...
This article addresses the excavation method and support design for the adit tunnel in the Rudrapray...
The geotechnical investigations play an important role in economic viability and structural stabilit...
Tunnels have been built since 2180 B.C., through the stone age. They became popular worldwide since ...
One of the main concerns in underground rock construction is the complexity and uncertainty of the g...
The Sardar Sarovar (Narmada) Project, Gujarat State envisages the construction of an underground pow...
Geotechnical evaluation of the 163 m high concrete gravity Sardar Sarovar (Narmada) dam, under const...
Support requirements for two caverns arc worked out by empirical and the numerical approaches. The a...
Reported case history of Himalayan tunnel reveals that Barton\u27s and Bieniawski\u27s classificatio...
The Karjan dam is located on the Deccan Basalt flows of Cretaceous - Eocene age in the Narmada valle...
Construction of a 23m wide, 57m high, and 210m long underground power house cavern is in progress as...
AbstractA 12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel borin...
Varahi river in Karnataka State, India originates on the Western Ghats and is harnessed for power ge...
Two earth and boulder fill dams of height 127.6 m and 72.2 m are major structures of Ramganga River ...
Since early sixties numerous tunnels had been planned and constructed for hydro-electric power gener...
Geotechnical assessment of the foundation including engineering geological investigations are essent...
This article addresses the excavation method and support design for the adit tunnel in the Rudrapray...
The geotechnical investigations play an important role in economic viability and structural stabilit...
Tunnels have been built since 2180 B.C., through the stone age. They became popular worldwide since ...
One of the main concerns in underground rock construction is the complexity and uncertainty of the g...