Construction delays are a common and major concern in most construction projects. Construction project delay can indirectly affect of project performance. Delay resolve method is to schedule crashing with various methods. This crashing planning is done by combining the Critical Path Method (CPM) and Time-Cost Trade-Off (TCTO) method for the minimum cost in crash duration calculation. Project A data is used to be a case studi in crash duration calculation and costs increase. Rescheduling with CPM result project completion time 120 days and after crashing project duration becomes 94 days, there was a reduction 26 days project completion time. Crashing programme are do to 18 activities from 30 critical activies rescheduling with CPM result. To...
Industri galangan kapal merupakan industri fabrikasi di sektor perkapalan yang melibatkan penggunaan...
This final examination to analyze the project schedule, time and cost of the project, the project sc...
Execution of a construction project requires a systematic and well-planned scheduling so that the pr...
CV. ABP a construction company worked in infrastructure building development for private and goverme...
Critical Path Method (CPM) dan Project Evaluation Review Technic (PERT) adalah metode yang banyak di...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
When the implementation of construction projects, there are several barriers that are often experien...
Planning until controlling process during construction work are important activity of a project. Suc...
The shipbuilding industry is a fabrication industry in the ship sector that involves the use of mate...
Construction of the Provincial road project from Parigi to Sukamanah is carried out by PT. Jaya Madi...
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – Cikampek II...
The Sangkulirang-Bontang road improvement project is in the form of delays on the seventhweek of Dec...
Proses perencanaan hingga pengendalian proyek selama pelaksanaan pekerjaan konstruksi merupakan kegi...
Planning is a guideline in implementing the project so that development can be implemented in ac...
This study aims to conduct a study on optimizing work performance on the work team forland developme...
Industri galangan kapal merupakan industri fabrikasi di sektor perkapalan yang melibatkan penggunaan...
This final examination to analyze the project schedule, time and cost of the project, the project sc...
Execution of a construction project requires a systematic and well-planned scheduling so that the pr...
CV. ABP a construction company worked in infrastructure building development for private and goverme...
Critical Path Method (CPM) dan Project Evaluation Review Technic (PERT) adalah metode yang banyak di...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
When the implementation of construction projects, there are several barriers that are often experien...
Planning until controlling process during construction work are important activity of a project. Suc...
The shipbuilding industry is a fabrication industry in the ship sector that involves the use of mate...
Construction of the Provincial road project from Parigi to Sukamanah is carried out by PT. Jaya Madi...
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – Cikampek II...
The Sangkulirang-Bontang road improvement project is in the form of delays on the seventhweek of Dec...
Proses perencanaan hingga pengendalian proyek selama pelaksanaan pekerjaan konstruksi merupakan kegi...
Planning is a guideline in implementing the project so that development can be implemented in ac...
This study aims to conduct a study on optimizing work performance on the work team forland developme...
Industri galangan kapal merupakan industri fabrikasi di sektor perkapalan yang melibatkan penggunaan...
This final examination to analyze the project schedule, time and cost of the project, the project sc...
Execution of a construction project requires a systematic and well-planned scheduling so that the pr...