none2noNowadays railway systems are highly affected by disturbances, occurring in daily operations, and causing train delays and passenger inconvenience. Not only they negatively affect the passengers satisfaction, but they also cause additional operational costs, since the planned schedule needs to be modified in real-time. Train timetabling is a particularly critical phase in railway system management, since, in real-time operations, all the changes applied to the planned timetable impact on platform assignment, rolling stock circulation and crew scheduling. Therefore, in the strategic planning, it is an important issue to determine robust timetables, i.e., timetables that “perform well” under disturbances, avoiding delay propagation as m...
The robustness of the timetable is a sensitive issue in the daily realization of railway operations....
We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger ...
This paper proposes an iterative approach to construct a passenger robust railway routing plan and t...
Nowadays railway systems are highly affected by disturbances, occurring in daily operations, and cau...
Abstract. Among railways optimization problems, the timetabling is one of the most impor-tant. Reduc...
In this paper we survey the main studies dealing with the train timetabling problem in its nominal a...
With increase in the use of railway transport, ensuring robustness in railway timetables has never b...
For a passenger railway system with a published timetable, train timetable adherence and punctuality...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
A tendency seen for the last decades in many European railway networks is a growing demand for capac...
Problem Description How to design a high-performing but reliable timetable for an intensely used, co...
Calculating timetables that are insensitive to disturbances has drawn considerable research efforts ...
Infrabel, the manager of the Belgian Railway Infrastructure, is responsible for developing the railw...
We propose a Lagrangian-based heuristic approach to obtain robust solutions to the Train Timetabling...
The robustness of the timetable is a sensitive issue in the daily realization of railway operations....
We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger ...
This paper proposes an iterative approach to construct a passenger robust railway routing plan and t...
Nowadays railway systems are highly affected by disturbances, occurring in daily operations, and cau...
Abstract. Among railways optimization problems, the timetabling is one of the most impor-tant. Reduc...
In this paper we survey the main studies dealing with the train timetabling problem in its nominal a...
With increase in the use of railway transport, ensuring robustness in railway timetables has never b...
For a passenger railway system with a published timetable, train timetable adherence and punctuality...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
A tendency seen for the last decades in many European railway networks is a growing demand for capac...
Problem Description How to design a high-performing but reliable timetable for an intensely used, co...
Calculating timetables that are insensitive to disturbances has drawn considerable research efforts ...
Infrabel, the manager of the Belgian Railway Infrastructure, is responsible for developing the railw...
We propose a Lagrangian-based heuristic approach to obtain robust solutions to the Train Timetabling...
The robustness of the timetable is a sensitive issue in the daily realization of railway operations....
We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger ...
This paper proposes an iterative approach to construct a passenger robust railway routing plan and t...