Published ArticleLarge errors in peak discharge estimates at catchment scales can be ascribed to errors in the estimation of catchment response time. The time parameters most frequently used to express catchment response time are the time of concentration (TC), lag time (TL) and time to peak (TP). This paper presents a review of the time parameter estimation methods used internationally, with selected comparisons in medium and large catchments in the C5 secondary drainage region in South Africa. The comparison of different time parameter estimation methods with recommended methods used in South Africa confirmed that the application of empirical methods, with no local correction factors, beyond their original developmental regions, mus...
Lagtimes and times of concentration are frequently determined parameters in hydrological design and ...
Time of concentration (TC) is a parameter in runoff estimation, used to study and design different t...
The original aim of this research was to determine the best means of calculating the relative delay ...
Published ArticleLarge errors in estimates of peak discharge in medium to large catchments in South...
Published ArticleDespite uncertainties and errors in measurement, observed peak discharges are the b...
Published ArticleCatchment response time parameters are one of the primary inputs required when desi...
Published ArticleIn single‐event deterministic design flood estimation methods, estimates of the pea...
[1] A new characteristic timescale of a catchment is presented, the response timescale (RTS). It is ...
DissertationCatchment response time parameters such as the time of concentration (TC), lag time (TL...
The Inter-Amount Times (IAT) adaptive sampling technique has been used for the analysis of hydrologi...
An investigation carried out into the values of lag time for catchment areas as measured from centr...
Methodologies to estimate the response time of a catchment to new rainfall inputs based on rainfall ...
Ph. D. University of KwaZulu-Natal, Pietermaritzburg 2015.Abstract and extended abstract available i...
Design rainfall estimates are primarily used in single-event deterministic design flood estimation m...
The uncertainties in the time of concentration (Tc) model estimate from contrasting environments con...
Lagtimes and times of concentration are frequently determined parameters in hydrological design and ...
Time of concentration (TC) is a parameter in runoff estimation, used to study and design different t...
The original aim of this research was to determine the best means of calculating the relative delay ...
Published ArticleLarge errors in estimates of peak discharge in medium to large catchments in South...
Published ArticleDespite uncertainties and errors in measurement, observed peak discharges are the b...
Published ArticleCatchment response time parameters are one of the primary inputs required when desi...
Published ArticleIn single‐event deterministic design flood estimation methods, estimates of the pea...
[1] A new characteristic timescale of a catchment is presented, the response timescale (RTS). It is ...
DissertationCatchment response time parameters such as the time of concentration (TC), lag time (TL...
The Inter-Amount Times (IAT) adaptive sampling technique has been used for the analysis of hydrologi...
An investigation carried out into the values of lag time for catchment areas as measured from centr...
Methodologies to estimate the response time of a catchment to new rainfall inputs based on rainfall ...
Ph. D. University of KwaZulu-Natal, Pietermaritzburg 2015.Abstract and extended abstract available i...
Design rainfall estimates are primarily used in single-event deterministic design flood estimation m...
The uncertainties in the time of concentration (Tc) model estimate from contrasting environments con...
Lagtimes and times of concentration are frequently determined parameters in hydrological design and ...
Time of concentration (TC) is a parameter in runoff estimation, used to study and design different t...
The original aim of this research was to determine the best means of calculating the relative delay ...