"Conducted by U. S. Army Engineer Waterways Experiment Station, Soils and Pavements Laboratory, Vicksburg, Mississippi.""May 1974.""Sponsored by Office of Dredged Material Research.""Includes appendices.""At head of title: Dredged Material Research Program."Includes bibliographical references (pages 174-177).Mode of access: Internet
"Prepared for Office, Chief of Engineers, U.S. Army.""July 1981."Cover title.Mode of access: Interne...
At head of title: "Dredging Operations Technical Support Program.""August 1985."Cover title.Bibliogr...
"At head of title: Dredged Material Research Program.""Monitored by Environmental Laboratory.""Prepa...
"July 1984."Cover title.Bibliography: p. 34-37.Final report.Prepared for and funded by U.S. Army Cor...
"At head of title: Dredged Material Research Program.""January 1976."Prepared for Environmental Effe...
Issued September 1974.Contract No. DACW-39-73-C0139.At head of title: Dredged material research prog...
"Conducted by U. S. Army Engineer Waterways Experiment Station, Office of Dredged Material Research,...
"DMRP Work Unit No. 2A09.""Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C.""Fin...
part of Task 2C (Containment Area Operations) of the Corps of Engineers Dredged Material Research Pr...
"August 1978."Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C.Cover title.Includ...
"June 1976.""At head of title: Dredged Material Research Program.""Prepared for Office, Chief of Eng...
At head of title: Dredged Material Research Program."Energy Resources Company, Inc.""Susaki [i.e. Sa...
"Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C. under DMRP Work Unit 1E04.""En...
This paper summarizes investigations conducted under the Dredged Material Research Program, Long-Ter...
"Prepared for Department of the Army, U.S. Army Corps of Engineers, Washington, D. C. and U. S. Envi...
"Prepared for Office, Chief of Engineers, U.S. Army.""July 1981."Cover title.Mode of access: Interne...
At head of title: "Dredging Operations Technical Support Program.""August 1985."Cover title.Bibliogr...
"At head of title: Dredged Material Research Program.""Monitored by Environmental Laboratory.""Prepa...
"July 1984."Cover title.Bibliography: p. 34-37.Final report.Prepared for and funded by U.S. Army Cor...
"At head of title: Dredged Material Research Program.""January 1976."Prepared for Environmental Effe...
Issued September 1974.Contract No. DACW-39-73-C0139.At head of title: Dredged material research prog...
"Conducted by U. S. Army Engineer Waterways Experiment Station, Office of Dredged Material Research,...
"DMRP Work Unit No. 2A09.""Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C.""Fin...
part of Task 2C (Containment Area Operations) of the Corps of Engineers Dredged Material Research Pr...
"August 1978."Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C.Cover title.Includ...
"June 1976.""At head of title: Dredged Material Research Program.""Prepared for Office, Chief of Eng...
At head of title: Dredged Material Research Program."Energy Resources Company, Inc.""Susaki [i.e. Sa...
"Prepared for Office, Chief of Engineers, U.S. Army, Washington, D.C. under DMRP Work Unit 1E04.""En...
This paper summarizes investigations conducted under the Dredged Material Research Program, Long-Ter...
"Prepared for Department of the Army, U.S. Army Corps of Engineers, Washington, D. C. and U. S. Envi...
"Prepared for Office, Chief of Engineers, U.S. Army.""July 1981."Cover title.Mode of access: Interne...
At head of title: "Dredging Operations Technical Support Program.""August 1985."Cover title.Bibliogr...
"At head of title: Dredged Material Research Program.""Monitored by Environmental Laboratory.""Prepa...