The purpose of this paper is to describe a process being utilized by Lockheed Space Operations Company (LSOC) for planning, developing and supporting an integrated information system for the Shuttle Processing Contract (SPC). This process was developed by Electronic Data Systems (EDS) to address the complex modernization and integration issues facing General Motors (GM). LSOC has contracted EDS to participate in adapting the process to the environment at Kennedy Space Center (KSC) for shuttle processing
Technical progress in the evolution of a transportation system, is marked by various stages. Namely,...
NASA’s Integrated Space Transportation Plan (ISTP) is focused on increasing safety and reliability, ...
Achieving low cost, reliable space transportation is one of the most important space policy challeng...
In a cooperative effort between Kennedy Space Center, Stanford University and Lockheed Space Operati...
To meet NASA Space Transportation System goals the Shuttle Processing Contractors have to reduce Spa...
The tasks involved in the Space Shuttle Development Program are discussed. The ten major characteris...
The Shuttle Processing Data Management System II (SPDMS IT) Network Documentation System, was design...
The Space Transportation System (STS) provides routine access to space for a wide range of customers...
In 1991 Lockheed Martin Space Operations deployed a Shop Floor Control (SFC) system in all flight pr...
This paper summarizes the status of management information systems with emphasis on applications to ...
The foremost challenge facing the aerospace industry during this decade is to develop the management...
The Launch Processing System represents Kennedy Space Center's role in providing a major integrated ...
United Space Alliance (USA) is the primary contractor responsible for processing the Space Transport...
The Space Systems Integration and Operations Research Applications (SIORA) Program was initiated in ...
The Portable Data Collection (PDC) Procedure System is currently being developed to allow Work Autho...
Technical progress in the evolution of a transportation system, is marked by various stages. Namely,...
NASA’s Integrated Space Transportation Plan (ISTP) is focused on increasing safety and reliability, ...
Achieving low cost, reliable space transportation is one of the most important space policy challeng...
In a cooperative effort between Kennedy Space Center, Stanford University and Lockheed Space Operati...
To meet NASA Space Transportation System goals the Shuttle Processing Contractors have to reduce Spa...
The tasks involved in the Space Shuttle Development Program are discussed. The ten major characteris...
The Shuttle Processing Data Management System II (SPDMS IT) Network Documentation System, was design...
The Space Transportation System (STS) provides routine access to space for a wide range of customers...
In 1991 Lockheed Martin Space Operations deployed a Shop Floor Control (SFC) system in all flight pr...
This paper summarizes the status of management information systems with emphasis on applications to ...
The foremost challenge facing the aerospace industry during this decade is to develop the management...
The Launch Processing System represents Kennedy Space Center's role in providing a major integrated ...
United Space Alliance (USA) is the primary contractor responsible for processing the Space Transport...
The Space Systems Integration and Operations Research Applications (SIORA) Program was initiated in ...
The Portable Data Collection (PDC) Procedure System is currently being developed to allow Work Autho...
Technical progress in the evolution of a transportation system, is marked by various stages. Namely,...
NASA’s Integrated Space Transportation Plan (ISTP) is focused on increasing safety and reliability, ...
Achieving low cost, reliable space transportation is one of the most important space policy challeng...