The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. Jordan, Inc., Portland, Maine
Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work fo...
This draft environmental impact statement (EIS) will describe the environmental impacts of transmiss...
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmi...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
This report is in partial fulfillment of the requirement of the National Environmental Policy Act of...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
The principal objective of this study is to identify the major types and intensity of social and eco...
This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities need...
This draft EIS Supplement describes the environmental impacts of updated transmission plans of the D...
The responsibility for marketing federally generated power (under provisions of the Flood Control Ac...
This report identifies alternative corridors of land within which transmission lines could be routed...
generated power (under provisions of the Flood Control Act of 1944) was transferred from the Departm...
Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work fo...
This draft environmental impact statement (EIS) will describe the environmental impacts of transmiss...
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmi...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
This report is in partial fulfillment of the requirement of the National Environmental Policy Act of...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
The U.S. Departments of the Interior and Energy have conducted system planning, location, and enviro...
The principal objective of this study is to identify the major types and intensity of social and eco...
This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities need...
This draft EIS Supplement describes the environmental impacts of updated transmission plans of the D...
The responsibility for marketing federally generated power (under provisions of the Flood Control Ac...
This report identifies alternative corridors of land within which transmission lines could be routed...
generated power (under provisions of the Flood Control Act of 1944) was transferred from the Departm...
Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work fo...
This draft environmental impact statement (EIS) will describe the environmental impacts of transmiss...
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmi...