Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient power revenues can be obtained from the sale of power under marketing arrangements consistent with Section 5 of the Flood Control Act of 1944 to repay all costs associated with the production and distribution of the power produced
The proposed multi-purpose hydroelectric power project at Dickey-Lincoln School would be the largest...
This design memorandum presents the results of current engineering and economic analyses which serve...
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed ...
Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient po...
The Dickey-Lincoln School Hydro Power Project was authorized by Congress in 1965. Advanced engineeri...
This report presents the results of Task 2 of this study, the overall purpose of which is the evalua...
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federall...
The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes P...
This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to e...
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natu...
This report summarizes the results of system planning, environmental, and location studies for trans...
The purpose of this report is to investigate various transmission system alternatives and recommend ...
Dickey-Lincoln School Lakes evolved as a result of a study of the Development of Tidal Power at Pass...
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immed...
The proposed multi-purpose hydroelectric power project at Dickey-Lincoln School would be the largest...
This design memorandum presents the results of current engineering and economic analyses which serve...
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed ...
Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient po...
The Dickey-Lincoln School Hydro Power Project was authorized by Congress in 1965. Advanced engineeri...
This report presents the results of Task 2 of this study, the overall purpose of which is the evalua...
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federall...
The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes P...
This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to e...
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natu...
This report summarizes the results of system planning, environmental, and location studies for trans...
The purpose of this report is to investigate various transmission system alternatives and recommend ...
Dickey-Lincoln School Lakes evolved as a result of a study of the Development of Tidal Power at Pass...
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immed...
The proposed multi-purpose hydroelectric power project at Dickey-Lincoln School would be the largest...
This design memorandum presents the results of current engineering and economic analyses which serve...
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed ...