Summarization: The analytical evaluation of the message delay in an approximate DQDB network model is investigated. The authors extend the results obtained by C. Bisdikian (1990), which assumes that each network node can queue at most one packet, to the case of node queues each holding an entire message containing l packets, via some unobvious reselection of model definitions. Corresponding to the single-packet waiting time analysis, they obtain an expression for the number of requests queued ahead of an arriving message, from which an expression for the average message delay can be derived. One conclusion drawn from the analysis is that the average steady-state message delay is linear in sufficiently large l. Furthermore, the analytical re...
An approximate model of coupled Markov chains is proposed and analyzed for a slotted ALOHA system wi...
Understanding the characteristics of the Internet delay space (i.e., the all-pairs set of static rou...
In large data communication network applications, message switching concentration technique is known...
Summarization: The analytical evaluation of the message delay in a distributed queue dual bus (DQDB)...
Summarization: The exact analytical model of distributed queue dual bus (DQDB) is known to have a st...
Summarization: The effect of the Bernoulli slot occupancy approximation, which is assumed in most di...
"A distributed queueing Medium Access Control (MAC) protocol is used in Distributed Queue Dual Bus (...
We investigate individual packet delay in a model of data networks with table-free, partial table an...
We study the message queueing delays in a node of a communication system, where a message consists o...
The DQDB network has been adopted by the IEEE Standard Committee as the subnetwork for the IEEE 802....
In this lecture note, the famous Little's Theorem is briefly reviewed. Little's Theorem ex...
141 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1987.In this thesis we develop a c...
Some of the applications in modern data networks are delay sensitive (e.g., video and voice). An en...
A Petri-net-based model of the distributed queue dual bus (DQDB) protocol is presented. The model is...
This thesis introduces a novel model for characterising network delays and a method derived from it ...
An approximate model of coupled Markov chains is proposed and analyzed for a slotted ALOHA system wi...
Understanding the characteristics of the Internet delay space (i.e., the all-pairs set of static rou...
In large data communication network applications, message switching concentration technique is known...
Summarization: The analytical evaluation of the message delay in a distributed queue dual bus (DQDB)...
Summarization: The exact analytical model of distributed queue dual bus (DQDB) is known to have a st...
Summarization: The effect of the Bernoulli slot occupancy approximation, which is assumed in most di...
"A distributed queueing Medium Access Control (MAC) protocol is used in Distributed Queue Dual Bus (...
We investigate individual packet delay in a model of data networks with table-free, partial table an...
We study the message queueing delays in a node of a communication system, where a message consists o...
The DQDB network has been adopted by the IEEE Standard Committee as the subnetwork for the IEEE 802....
In this lecture note, the famous Little's Theorem is briefly reviewed. Little's Theorem ex...
141 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1987.In this thesis we develop a c...
Some of the applications in modern data networks are delay sensitive (e.g., video and voice). An en...
A Petri-net-based model of the distributed queue dual bus (DQDB) protocol is presented. The model is...
This thesis introduces a novel model for characterising network delays and a method derived from it ...
An approximate model of coupled Markov chains is proposed and analyzed for a slotted ALOHA system wi...
Understanding the characteristics of the Internet delay space (i.e., the all-pairs set of static rou...
In large data communication network applications, message switching concentration technique is known...