This report contains results of a technical review of software, identified as LGCALC, that processes data collected by a high-resolution gamma-ray borehole logging system. The software presently operates within Westinghouse Hanford Company, Department of Geosciences, to process data collected by the Radionuclide Logging System. The software has been reviewed for its suitability for processing data to be collected by new high-resolution gamma-ray logging trucks scheduled to begin operational tests within Westinghouse Tank Waste Remediation Systems during 1994. Examination of the program code and hands-on operational tests have shown that this software is suitable for its intended use of processing high-resolution gamma-ray data obtained from...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
Wide-spread application of spectral gamma ray logging system in mineral exploration has not really d...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
This report describes the procedures and computer programs used to process spectral gamma-ray boreho...
A Gamma Spectroscopy Logging System (GSLS) has been developed to study sub-surface radionuclide cont...
This report describes the 1991 yearly calibration of a gross gamma-ray geophysical pulse logging sys...
The US Department of Energy`s (DOE`s) Grand Junction Projects Office (GJPO) is engaged in establishi...
Six characterization boreholes were drilled, sampled, logged, and abandoned in the 100-FR-1 Operable...
The U.S. Department of Energy`s (DOE) Grand Junction Projects Office (GJPO) is establishing an initi...
Wide-spread application of gamma ray logging system in mineral exploration has long been desired by ...
Gamma-ray scanning is a non-destructive testing method based on gamma-ray absorption principle. It i...
This report represents the results of analyses received on or before August 15, 1996 for the first a...
This report describes the development history and characteristics of software developed in the Safeg...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
In the characterization work underway at the Nevada Test Site Underground Test Area, the logging con...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
Wide-spread application of spectral gamma ray logging system in mineral exploration has not really d...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
This report describes the procedures and computer programs used to process spectral gamma-ray boreho...
A Gamma Spectroscopy Logging System (GSLS) has been developed to study sub-surface radionuclide cont...
This report describes the 1991 yearly calibration of a gross gamma-ray geophysical pulse logging sys...
The US Department of Energy`s (DOE`s) Grand Junction Projects Office (GJPO) is engaged in establishi...
Six characterization boreholes were drilled, sampled, logged, and abandoned in the 100-FR-1 Operable...
The U.S. Department of Energy`s (DOE) Grand Junction Projects Office (GJPO) is establishing an initi...
Wide-spread application of gamma ray logging system in mineral exploration has long been desired by ...
Gamma-ray scanning is a non-destructive testing method based on gamma-ray absorption principle. It i...
This report represents the results of analyses received on or before August 15, 1996 for the first a...
This report describes the development history and characteristics of software developed in the Safeg...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
In the characterization work underway at the Nevada Test Site Underground Test Area, the logging con...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...
Wide-spread application of spectral gamma ray logging system in mineral exploration has not really d...
Logging was performed with the sea floor drill rig MARUM-MeBo70 in a borehole drilled with a 103 mm ...