During 1978, a plutonium (/sup 239/Pu) contaminated incinerator facility at the Los Alamos National Laboratory, Los Alamos, New Mexico, was decommissioned. The project involved dismantling the facility and burying the debris at an on-site radioactive solid waste disposal/storage area. Contaminated soil from the 5000 m/sup 2/ area was also buried. The facility was constructed in 1951 to incinerate /sup 239/Pu contaminated wastes. It was later used as a decontamination facility. The major features included a 185-m/sup 2/ floor area control building, incinerator, cyclone dust collector, spray cooler, venturi scrubber, air filter bank, ash separator, and two 140 000-liter ash storage tanks. Six-hundred cubic meters of debris and 1200 m/sup 3/ o...
The Los Alamos National Laboratory has ongoing national security missions that necessitate increased...
In 1973, Argonne National Laboratory began consolidating and upgrading its plutonium-handling operat...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...
The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, an...
The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, an...
The Los Alamos National Laboratory (LANL) Decommissioning Program has decontaminated and demolished ...
Approximately 200 contaminated surplus structures require decommissioning at Los Alamos National Lab...
The process of decommissioning a facility such as a nuclear reactor or reprocessing plant presents m...
This paper describes the unique challenges encountered and subsequent resolutions to accomplish the ...
The Fission Product Pilot Plant (FPPP) at the Oak Ridge National Laboratory (ORNL) was one of the fi...
An exhaust air filter building contaminated with /sup 227/Ac was decommissioned at the Los Alamos Na...
As a result of the evaporation explosion in the Radiochemical Processing Pilot Plant on Nov. 20, 195...
This paper describes the deactivation and source term reduction activities conducted over the recent...
A radiological survey was conducted on the undeveloped portions of the site of the former Main Techn...
The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, dec...
The Los Alamos National Laboratory has ongoing national security missions that necessitate increased...
In 1973, Argonne National Laboratory began consolidating and upgrading its plutonium-handling operat...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...
The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, an...
The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, an...
The Los Alamos National Laboratory (LANL) Decommissioning Program has decontaminated and demolished ...
Approximately 200 contaminated surplus structures require decommissioning at Los Alamos National Lab...
The process of decommissioning a facility such as a nuclear reactor or reprocessing plant presents m...
This paper describes the unique challenges encountered and subsequent resolutions to accomplish the ...
The Fission Product Pilot Plant (FPPP) at the Oak Ridge National Laboratory (ORNL) was one of the fi...
An exhaust air filter building contaminated with /sup 227/Ac was decommissioned at the Los Alamos Na...
As a result of the evaporation explosion in the Radiochemical Processing Pilot Plant on Nov. 20, 195...
This paper describes the deactivation and source term reduction activities conducted over the recent...
A radiological survey was conducted on the undeveloped portions of the site of the former Main Techn...
The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, dec...
The Los Alamos National Laboratory has ongoing national security missions that necessitate increased...
In 1973, Argonne National Laboratory began consolidating and upgrading its plutonium-handling operat...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...