This volume contains: Hudson No. 2 Limited Retrofit Cost Estimates provided by Stone and Webster Engineering Corp. (SWEC); backup data and basis of estimate for SWEC Heater Plant and Gas Turbine Plant (Kearny No. 12) cost estimates; and Appendices - Analysis of Relevant Tax Laws
Prepared for the U.S. Dept. of Energy under contract no. EM 78-C-02-4980.Vol. [2]: Appendices.Mode o...
The technical and economic feasibility of retrofitting thermal power plants in Minnesota to accommod...
A study of the potential for district heating in Minnesota was conducted as part of the Minnesota En...
This volume contains the following: discussion of cost estimating methodology, detailed cost estimat...
This appendix presents tabulated data used for evaluating the feasibility of retrofitting thermal po...
This volume begins with an Introduction summarizing the history, methodology and scope of the study,...
This volume presents information on the institutional factors, i.e., legal and regulatory aspects, a...
The potential for district heating was examined in terms of a total (regional) system and two subsys...
This Final Report (Volume 2) of Phase 1 of District Heating for Communities Through Power Plant Retr...
An analysis was performed investigating the potential of retrofitting Detroit Edison's Conners ...
This final report of Phase I of the study presents Task 4, Technical Review and Assessment. The most...
The technical-economic feasibility and environmental acceptability of a district heating and cooling...
Following DOE's RFP for District Heating and Cooling Through Power Plant Retrofit, Detroit Edis...
Appendix A, Utility Plant Characteristics, contains information describing the characteristics of se...
The Phase I Identification and Assessment Study was aimed at surveying the State of Wisconsin to ide...
Prepared for the U.S. Dept. of Energy under contract no. EM 78-C-02-4980.Vol. [2]: Appendices.Mode o...
The technical and economic feasibility of retrofitting thermal power plants in Minnesota to accommod...
A study of the potential for district heating in Minnesota was conducted as part of the Minnesota En...
This volume contains the following: discussion of cost estimating methodology, detailed cost estimat...
This appendix presents tabulated data used for evaluating the feasibility of retrofitting thermal po...
This volume begins with an Introduction summarizing the history, methodology and scope of the study,...
This volume presents information on the institutional factors, i.e., legal and regulatory aspects, a...
The potential for district heating was examined in terms of a total (regional) system and two subsys...
This Final Report (Volume 2) of Phase 1 of District Heating for Communities Through Power Plant Retr...
An analysis was performed investigating the potential of retrofitting Detroit Edison's Conners ...
This final report of Phase I of the study presents Task 4, Technical Review and Assessment. The most...
The technical-economic feasibility and environmental acceptability of a district heating and cooling...
Following DOE's RFP for District Heating and Cooling Through Power Plant Retrofit, Detroit Edis...
Appendix A, Utility Plant Characteristics, contains information describing the characteristics of se...
The Phase I Identification and Assessment Study was aimed at surveying the State of Wisconsin to ide...
Prepared for the U.S. Dept. of Energy under contract no. EM 78-C-02-4980.Vol. [2]: Appendices.Mode o...
The technical and economic feasibility of retrofitting thermal power plants in Minnesota to accommod...
A study of the potential for district heating in Minnesota was conducted as part of the Minnesota En...