The long-lead items required for the Industrial Fuel Gas Demonstration Plant are given. Utilizing the Construction Plan (Deliverable No. 37), which is based upon 48 months to the completion of Phase II, the delivery requirements for each equipment item were determined. Required delivery dates were ascertained from the erection sequence for IFG Demonstration Plant units and equipment items. Lead times established by FWEC procurement personnel were then applied to arrive at a date when procurement action must be initiated. Procurement schedules for all equipment items are included in this document. Also evaluated were the activities required prior to actual placement of the order. Appropriate time has been included at the front end for receip...
This report describes the staffing plans of each industrial team member during final design and cons...
Paragraph 10, Article (4) I, Technical Direction and Contract Administration of Prime Contract No. E...
The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibili...
Fixed-price supply type bid packages for materials and/or service essentially are comprised of two p...
The Demo Plant Operating Plan is composed of the following sequence of events starting with the trai...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
FWEC Corporate Policy calls for full compliance within the intent and purpose of the Federal Law. Th...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
A major problem which arose during the reporting period was that of the completion of the required e...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
In the context of energy demands by growing economies, climate changes, fossil fuel pricing volatili...
This report describes the staffing plans of each industrial team member during final design and cons...
Paragraph 10, Article (4) I, Technical Direction and Contract Administration of Prime Contract No. E...
The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibili...
Fixed-price supply type bid packages for materials and/or service essentially are comprised of two p...
The Demo Plant Operating Plan is composed of the following sequence of events starting with the trai...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
FWEC Corporate Policy calls for full compliance within the intent and purpose of the Federal Law. Th...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
A major problem which arose during the reporting period was that of the completion of the required e...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
In the context of energy demands by growing economies, climate changes, fossil fuel pricing volatili...
This report describes the staffing plans of each industrial team member during final design and cons...
Paragraph 10, Article (4) I, Technical Direction and Contract Administration of Prime Contract No. E...
The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibili...