The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands...
This report describes the staffing plans of each industrial team member during final design and cons...
This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light...
Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, ...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
The plant will utilize fixed bed, stirred, two stage gasifiers. The lower stage will be a standard g...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibili...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
One area of the Industrial Fuel Gas Demonstration-Plant Program requiring major technical support is...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
Three approaches to pretreatment for the Industrial Fuel Gas Demonstration Plant project in the Inst...
The long-lead items required for the Industrial Fuel Gas Demonstration Plant are given. Utilizing th...
This report describes the staffing plans of each industrial team member during final design and cons...
This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light...
Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, ...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
The plant will utilize fixed bed, stirred, two stage gasifiers. The lower stage will be a standard g...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibili...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
One area of the Industrial Fuel Gas Demonstration-Plant Program requiring major technical support is...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
Three approaches to pretreatment for the Industrial Fuel Gas Demonstration Plant project in the Inst...
The long-lead items required for the Industrial Fuel Gas Demonstration Plant are given. Utilizing th...
This report describes the staffing plans of each industrial team member during final design and cons...
This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light...
Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, ...