The objective of the Industrial Fuel Gas Demonstration Plant Program is to demonstrate the feasibility of converting agglomerating and high sulfur coal to clean fuel gas and utilizing this gas in a commercial application. Specific objectives are to conduct process analysis, design, construction, testing, operation and evaluation of a plant based on the U-Gas process for converting coal to industrial fuel gas. Phase I of the MLGW Industrial Fuel Gas Demonstration Plant Program started in September, 1977. In the first quarter of 1978, a conceptual design of a commercial plant was started, together with environmental monitoring activities and technical support work at the U-Gas pilot plant. After a series of successful pilot plant runs during ...
The overall objective of this project is to develop the IGT Mild-Gasification (MILDGAS) process for ...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
One area of the Industrial Fuel Gas Demonstration-Plant Program requiring major technical support is...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
A new pilot plant program developed by DOE and the team members, was started on September 20, 1978. ...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
The Demo Plant Operating Plan is composed of the following sequence of events starting with the trai...
Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, ...
The plant will utilize fixed bed, stirred, two stage gasifiers. The lower stage will be a standard g...
A major problem which arose during the reporting period was that of the completion of the required e...
The Development Program to Support Industrial Coal Gasification is on schedule. The efforts have cen...
The overall objective of this project is to develop the IGT Mild-Gasification (MILDGAS) process for ...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
One area of the Industrial Fuel Gas Demonstration-Plant Program requiring major technical support is...
Work during the July-September period was concentrated on the preparation of the Task I report. The ...
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical...
A new pilot plant program developed by DOE and the team members, was started on September 20, 1978. ...
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been s...
The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water D...
This report presents a Conceptual Design and Evaluation of Commercial Plant report in four volumes a...
Efforts of Task VI - Materials, Agreements, and Licenses for the Demonstration plant, Phase I involv...
The Demo Plant Operating Plan is composed of the following sequence of events starting with the trai...
Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, ...
The plant will utilize fixed bed, stirred, two stage gasifiers. The lower stage will be a standard g...
A major problem which arose during the reporting period was that of the completion of the required e...
The Development Program to Support Industrial Coal Gasification is on schedule. The efforts have cen...
The overall objective of this project is to develop the IGT Mild-Gasification (MILDGAS) process for ...
The IFG plant will convert 3160 tons per day of high-sulfur coal to produce 175 million cubic feet o...
One area of the Industrial Fuel Gas Demonstration-Plant Program requiring major technical support is...