This report details the performance of Phase II: Verification Tests of the Conspray dynamic sleeve piston coal feeder. The machine performed for 200 hours at 700 psi backpressure, utilizing a 70% to 200 mesh Utah bituminous coal as feedstock. All test work was satisfactorily completed. A post-test inspection was performed. A report of component wear and failures incurred in testing is included as well as suggestions for machine upgrades. The overall conclusion is that the dynamic sleeve piston feeder has proven its ability to operate safely and reliably. When problems have occurred, the machine has demonstrated inherent safety by shutting down without endangering process or personnel. With the recommended improvements incorporated into the ...
The Rotary Combustor is a novel concept for burning coal with low SO{sub 2} and NO{sub x} emissions....
The project goal is to develop an advanced coal beneficiation technology that can achieve high recov...
The key issues addressed this quarter were related to operational problems in the coal feed system, ...
The pilot-scale piston-feeder development is progressing satisfactorily and should proceed as planne...
This report summarizes the results of the Phase III of the Coal Feeder Development Program carried o...
The overall objective of this project is the development of a mechanical rotary-disk feeder, known a...
This research program is concerned with the development of a new form of feeder, known as the Stamet...
ABB CE is evaluating alternate methods of coal feed across a pressure barrier for its pressurized co...
This feeder concept uniquely combines the functions of solids feeding, metering, and pressurization ...
As a result of the work carried out in Phases I and II, the Kinetic Extruder was selected for furthe...
Test Directive No. 1 provided the operating conditions and process requirements for the first coal t...
This report discusses Test Campaign TC10 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier ...
This report describes the work done under Phase I, the moisture tolerance testing of the Kinetic Ext...
Development of a coal feeding and distribution system is one of the major requirements for successfu...
A Test Plan Report has been prepared which details all the tests proposed for the 1983 operational s...
The Rotary Combustor is a novel concept for burning coal with low SO{sub 2} and NO{sub x} emissions....
The project goal is to develop an advanced coal beneficiation technology that can achieve high recov...
The key issues addressed this quarter were related to operational problems in the coal feed system, ...
The pilot-scale piston-feeder development is progressing satisfactorily and should proceed as planne...
This report summarizes the results of the Phase III of the Coal Feeder Development Program carried o...
The overall objective of this project is the development of a mechanical rotary-disk feeder, known a...
This research program is concerned with the development of a new form of feeder, known as the Stamet...
ABB CE is evaluating alternate methods of coal feed across a pressure barrier for its pressurized co...
This feeder concept uniquely combines the functions of solids feeding, metering, and pressurization ...
As a result of the work carried out in Phases I and II, the Kinetic Extruder was selected for furthe...
Test Directive No. 1 provided the operating conditions and process requirements for the first coal t...
This report discusses Test Campaign TC10 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier ...
This report describes the work done under Phase I, the moisture tolerance testing of the Kinetic Ext...
Development of a coal feeding and distribution system is one of the major requirements for successfu...
A Test Plan Report has been prepared which details all the tests proposed for the 1983 operational s...
The Rotary Combustor is a novel concept for burning coal with low SO{sub 2} and NO{sub x} emissions....
The project goal is to develop an advanced coal beneficiation technology that can achieve high recov...
The key issues addressed this quarter were related to operational problems in the coal feed system, ...