The Plutonium Air Transportable Package, Model PAT-1, is certified under Title 10, Code of Federal Regulations Part 71 by the U.S. Nuclear Regulatory Commission (NRC) per Certificate of Compliance (CoC) USA/0361B(U)F-96 (currently Revision 9). The National Nuclear Security Administration (NNSA) submitted SAND Report SAND2009-5822 to NRC that documented the incorporation of plutonium (Pu) metal as a new payload for the PAT-1 package. NRC responded with a Request for Additional Information (RAI), identifying information needed in connection with its review of the application. The purpose of this SAND report is to provide the authors responses to each RAI. SAND Report SAND2010-6106 containing the proposed changes to the Addendum is provided se...
This correspondence serves as a follow-up to a previous letter dated March 10, 2000, which served to...
During the period from 1954 through 1963, a number of tests were conducted on the Nevada Test Site (...
The following description and any attachments and references are provided to the Washington State De...
"Date published: June 1978.""NUREG-0361."Includes bibliographical references.Mode of access: Interne...
An Addendum was written to the Model 9977 Safety Analysis Report for Packaging adding a new content ...
The Department of Energy (DOE) desires to ship Model 9975-85 and Model 9975-96 Packages loaded with ...
This report describes part of a program carried out by the Rocky Flats Division of the Dow Chemical ...
Report containing supplementary material for "Plutonium Recycle Critical Facility, Final Safeguards ...
The ZPR-3 is now operating with up to 230 kg of plutonium as described in ANL-6504. In that report, ...
The Savannah River Site (SRS) stores packages containing plutonium (Pu) materials in the K-Area Comp...
A letter report issued by the Government Accountability Office with an abstract that begins "The Nat...
- RAI Numbers 17.4-48, 17.4-49, and 17.4-50 Enclosure 1 contains the GE Hitachi Nuclear Energy (GEH)...
One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final...
A letter report issued by the Government Accountability Office with an abstract that begins "The end...
The following description and any attachments and references are provided to the Washington State De...
This correspondence serves as a follow-up to a previous letter dated March 10, 2000, which served to...
During the period from 1954 through 1963, a number of tests were conducted on the Nevada Test Site (...
The following description and any attachments and references are provided to the Washington State De...
"Date published: June 1978.""NUREG-0361."Includes bibliographical references.Mode of access: Interne...
An Addendum was written to the Model 9977 Safety Analysis Report for Packaging adding a new content ...
The Department of Energy (DOE) desires to ship Model 9975-85 and Model 9975-96 Packages loaded with ...
This report describes part of a program carried out by the Rocky Flats Division of the Dow Chemical ...
Report containing supplementary material for "Plutonium Recycle Critical Facility, Final Safeguards ...
The ZPR-3 is now operating with up to 230 kg of plutonium as described in ANL-6504. In that report, ...
The Savannah River Site (SRS) stores packages containing plutonium (Pu) materials in the K-Area Comp...
A letter report issued by the Government Accountability Office with an abstract that begins "The Nat...
- RAI Numbers 17.4-48, 17.4-49, and 17.4-50 Enclosure 1 contains the GE Hitachi Nuclear Energy (GEH)...
One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final...
A letter report issued by the Government Accountability Office with an abstract that begins "The end...
The following description and any attachments and references are provided to the Washington State De...
This correspondence serves as a follow-up to a previous letter dated March 10, 2000, which served to...
During the period from 1954 through 1963, a number of tests were conducted on the Nevada Test Site (...
The following description and any attachments and references are provided to the Washington State De...