This report uses a rainfall-runoff simulation model to improve flood-frequency estimates in Tennessee. It includes illustrations, hydrographs, and other maps
The Hydrologic Engineering Center (HEC) was contracted by the U. S. Army Corps of Engineers, Nashvil...
Debris flows occur frequently in remote areas of Great Smoky Mountains National Park, Tennessee. Rai...
From introduction: This report is the third in a series by the U.S. Geological Survey whose aim is t...
16 * AbstractsThe U. S. Geological Survey rainfall-runoff simulation model was used in conjunction w...
This report uses a hydrologic system to collect streamflow data from several basins in Davidson Coun...
From introduction: This report describes an alternative approach to developing flood frequency chara...
From introduction: The purpose of this report is to present methods for estimating depths of various...
Report and geological survey. This report uses maps that depict climatic factors to make a flood-fre...
Purpose and scope: This report evaluates the rainfall-runoff data collected at 12 sites on 10 stream...
Agricultural runoff modeling was performed on North Reelfoot Creek watershed using Hydrological Simu...
This report presents "a technique for estimating the magnitude and frequency of floods in the Housto...
From abstract: "A series of equations was developed to provide a better method of determining flood ...
From abstract: A knowledge of the magnitude and frequency of floods is needed for the design of high...
Increased urbanization in this area is causing runoff from storm events and increasingly serious flo...
Shipping list no.: 93-0345-P.Includes bibliographical references (p. 37-38).Mode of access: Internet
The Hydrologic Engineering Center (HEC) was contracted by the U. S. Army Corps of Engineers, Nashvil...
Debris flows occur frequently in remote areas of Great Smoky Mountains National Park, Tennessee. Rai...
From introduction: This report is the third in a series by the U.S. Geological Survey whose aim is t...
16 * AbstractsThe U. S. Geological Survey rainfall-runoff simulation model was used in conjunction w...
This report uses a hydrologic system to collect streamflow data from several basins in Davidson Coun...
From introduction: This report describes an alternative approach to developing flood frequency chara...
From introduction: The purpose of this report is to present methods for estimating depths of various...
Report and geological survey. This report uses maps that depict climatic factors to make a flood-fre...
Purpose and scope: This report evaluates the rainfall-runoff data collected at 12 sites on 10 stream...
Agricultural runoff modeling was performed on North Reelfoot Creek watershed using Hydrological Simu...
This report presents "a technique for estimating the magnitude and frequency of floods in the Housto...
From abstract: "A series of equations was developed to provide a better method of determining flood ...
From abstract: A knowledge of the magnitude and frequency of floods is needed for the design of high...
Increased urbanization in this area is causing runoff from storm events and increasingly serious flo...
Shipping list no.: 93-0345-P.Includes bibliographical references (p. 37-38).Mode of access: Internet
The Hydrologic Engineering Center (HEC) was contracted by the U. S. Army Corps of Engineers, Nashvil...
Debris flows occur frequently in remote areas of Great Smoky Mountains National Park, Tennessee. Rai...
From introduction: This report is the third in a series by the U.S. Geological Survey whose aim is t...