Understanding the links between remote conditions, such as tropical sea surface temperatures, and regional climate has the potential to improve streamflow predictions, with associated economic benefits for reservoir operation. Better definition of land surface moisture states (soil moisture and snow water storage) at the beginning of the forecast period provides an additional source of streamflow predictability. The value of long-lead predictive skill added by climate forecast information and land surface moisture states in the Missouri River basin is examined. Forecasted flows were generated that represent predictability achievable through knowledge of climate, snow, and soil moisture states. For the current main-stem reservoirs (90 × 109 ...
This study attempts to investigate potential impacts of future climate change on streamflow and rese...
Soil moisture to abil streamflow prediction, even when the prediction skill for rainfall is small. n...
In any plan for the development of water and land resources, hydrology must be a basic consideration...
Presented at Irrigated agriculture responds to water use challenges - strategies for success: USCID ...
The past decade has brought significant advancements in seasonal climate forecasting. However, wate...
We explore a strategy for long-range hydrologic forecasting that uses ensemble climate model forecas...
Forecasting seasonal runoff is an important challenge in the western U.S. because the timing and vol...
The presence of year-round surface water in streams (i.e., streamflow permanence) is an important fa...
Citation: Sheshukov, A.Y.; Douglas-Mankin, K.R. Hydrologic Alterations Predicted by Seasonally-Consi...
Study region: Sacramento San Joaquin River Basin, California Study focus: The study forecasts the st...
Terrestrial water storage (TWS) in high mountain areas contributes large runoff volumes to nearby lo...
This study incorporates antecedent (preceding) soil moisture into forecasting streamflow volumes wit...
Graduation date: 2015Access restricted to the OSU Community, at author's request, from Feb. 11, 2015...
The Natural Resources Conservation Service (NRCS) produces water supply forecasts for most of the st...
Global seasonal hydrologic prediction is crucial to mitigating the impacts of droughts and floods, e...
This study attempts to investigate potential impacts of future climate change on streamflow and rese...
Soil moisture to abil streamflow prediction, even when the prediction skill for rainfall is small. n...
In any plan for the development of water and land resources, hydrology must be a basic consideration...
Presented at Irrigated agriculture responds to water use challenges - strategies for success: USCID ...
The past decade has brought significant advancements in seasonal climate forecasting. However, wate...
We explore a strategy for long-range hydrologic forecasting that uses ensemble climate model forecas...
Forecasting seasonal runoff is an important challenge in the western U.S. because the timing and vol...
The presence of year-round surface water in streams (i.e., streamflow permanence) is an important fa...
Citation: Sheshukov, A.Y.; Douglas-Mankin, K.R. Hydrologic Alterations Predicted by Seasonally-Consi...
Study region: Sacramento San Joaquin River Basin, California Study focus: The study forecasts the st...
Terrestrial water storage (TWS) in high mountain areas contributes large runoff volumes to nearby lo...
This study incorporates antecedent (preceding) soil moisture into forecasting streamflow volumes wit...
Graduation date: 2015Access restricted to the OSU Community, at author's request, from Feb. 11, 2015...
The Natural Resources Conservation Service (NRCS) produces water supply forecasts for most of the st...
Global seasonal hydrologic prediction is crucial to mitigating the impacts of droughts and floods, e...
This study attempts to investigate potential impacts of future climate change on streamflow and rese...
Soil moisture to abil streamflow prediction, even when the prediction skill for rainfall is small. n...
In any plan for the development of water and land resources, hydrology must be a basic consideration...