In an effort to address the bump at the endˆ of the bridge problem, ODOT has undertaken an experimental construction research project to evaluate five different approach embankment construction methods. The research is being conducted at a relocation project in which three new bridges are being constructed to relocate a two-mile section of U.S. 177 north of Stillwater, Oklahoma. Five of the six approach embankments are approximately the same height and the foundation soils are relatively uniform, consisting of fine to medium dense sands. Materials and construction methods used for the five approach embankments in the study include: unclassified borrow placed by contractor's discretion (i.e., equipment)-this serves as the control for the res...
Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) is an alternative bridge constructio...
Presented herein are analyses of 6 bridge approaches. Lateral movement and settlement of the foundat...
PDFTech ReportOR-EF-98-04GeotextilesEmbankmentsReinforcement (Engineering)BridgesSettlement (Structu...
This paper presents preliminary findings based on the initial performance evaluation of five approac...
The purpose of this thesis is to present the instrumentation data from the approach embankments. A l...
Approach embankment settlement is a pervasive problem in Oklahoma and many other states. The bump an...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
PDFTech ReportFHWA-OK-13-09ODOT SP&R Item Number 2227EmbankmentsBridge approachesSlabsFoundationsSoi...
The proposed expansion of ramps connecting Interstate Route 664 with Interstate Route 64 at Hampton,...
009748122004Final ReportPDFTech ReportRDT 04-010RI02-033Bridge abutmentsBridge approachesCompactionC...
70171561Final report.PDFTech ReportFHWA/VTRC 06-R36Embankment foundationsPiles (Supports)Field tests...
The report examines the cause of a differential settlement between the highway approach embankments ...
Geotextile reinforcement was used to construct an embankment for a four lane divided highway over up...
PDFTech ReportFHWA-WY-15/01F64737Bridge approachesSlabsSettlement (Structures)Backfill soilsBridge d...
Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) is an alternative bridge constructio...
Presented herein are analyses of 6 bridge approaches. Lateral movement and settlement of the foundat...
PDFTech ReportOR-EF-98-04GeotextilesEmbankmentsReinforcement (Engineering)BridgesSettlement (Structu...
This paper presents preliminary findings based on the initial performance evaluation of five approac...
The purpose of this thesis is to present the instrumentation data from the approach embankments. A l...
Approach embankment settlement is a pervasive problem in Oklahoma and many other states. The bump an...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
To evaluate the causes of bridge approach settlement a survey of 758 bridge approaches in seventy-se...
PDFTech ReportFHWA-OK-13-09ODOT SP&R Item Number 2227EmbankmentsBridge approachesSlabsFoundationsSoi...
The proposed expansion of ramps connecting Interstate Route 664 with Interstate Route 64 at Hampton,...
009748122004Final ReportPDFTech ReportRDT 04-010RI02-033Bridge abutmentsBridge approachesCompactionC...
70171561Final report.PDFTech ReportFHWA/VTRC 06-R36Embankment foundationsPiles (Supports)Field tests...
The report examines the cause of a differential settlement between the highway approach embankments ...
Geotextile reinforcement was used to construct an embankment for a four lane divided highway over up...
PDFTech ReportFHWA-WY-15/01F64737Bridge approachesSlabsSettlement (Structures)Backfill soilsBridge d...
Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) is an alternative bridge constructio...
Presented herein are analyses of 6 bridge approaches. Lateral movement and settlement of the foundat...
PDFTech ReportOR-EF-98-04GeotextilesEmbankmentsReinforcement (Engineering)BridgesSettlement (Structu...