This report presents a complete inventory and analysis of all existing open space and recreation facilities. From this survey of 1966 conditions and needs the basic future requirements for county open space have been drawn. In addition to the inventory, the report also includes: a general introduction; open space and recreation standards; a needs analysis; and the proposed county open space and recreation plan.The preparation of this report was financially aided through a Federal grant from the Urban Renewal Administration of the Housing and Home Finance Agency, under the Urban Planning Assistance Program authorized by Section 701 of the Housing Act of 1954, as amended. The remainder has been financed by local funds and by an appropriation...
This summary of the New Jersey Comprehensive Outdoor Recreation Plan is a part of the long range Sta...
The principal goals of the 1973 Statewide Comprehensive Outdoor Recreation Plan are[he continual acc...
The 1994-1999 New Jersey Open Space and Outdoor Recreation Plan is the sixth statewide comprehensive...
This report constitutes the second step in the preparation of a County Open Space and Recreation Pla...
Included in the report is a sketch plan of the County showing priority open space sites to be acquir...
Analysis of open space and recreation facilities in the county, including roles of government and co...
PREFACE 1-13; I. INVENTORY OF EXISTING OPEN SPACE ; A. Municipal Recreation Facilities 1-17; B...
This recreation and open space plan for Bergen County has been structured to acknowledge the four ba...
Bergen County's nearly one million population is currently served by more than 10,500 acres of publi...
The 1994 New Jersey Open Space and Outdoor Recreation Plan is the sixth comprehensive outdoor recrea...
The report attempts to take a new look at land resources in Cumberland County. The land use in all ...
A survey of all private, commercial, and quasi-public outdoor recreational facilities in the State w...
This report includes an inventory of potential open space in Franklin Township, and recommends a sys...
The last open space plan time that an open space plan was adopted for Monmouth County was 1970. Thi...
This study is an integral part of the comprehensive plan being prepared for Camden county and is int...
This summary of the New Jersey Comprehensive Outdoor Recreation Plan is a part of the long range Sta...
The principal goals of the 1973 Statewide Comprehensive Outdoor Recreation Plan are[he continual acc...
The 1994-1999 New Jersey Open Space and Outdoor Recreation Plan is the sixth statewide comprehensive...
This report constitutes the second step in the preparation of a County Open Space and Recreation Pla...
Included in the report is a sketch plan of the County showing priority open space sites to be acquir...
Analysis of open space and recreation facilities in the county, including roles of government and co...
PREFACE 1-13; I. INVENTORY OF EXISTING OPEN SPACE ; A. Municipal Recreation Facilities 1-17; B...
This recreation and open space plan for Bergen County has been structured to acknowledge the four ba...
Bergen County's nearly one million population is currently served by more than 10,500 acres of publi...
The 1994 New Jersey Open Space and Outdoor Recreation Plan is the sixth comprehensive outdoor recrea...
The report attempts to take a new look at land resources in Cumberland County. The land use in all ...
A survey of all private, commercial, and quasi-public outdoor recreational facilities in the State w...
This report includes an inventory of potential open space in Franklin Township, and recommends a sys...
The last open space plan time that an open space plan was adopted for Monmouth County was 1970. Thi...
This study is an integral part of the comprehensive plan being prepared for Camden county and is int...
This summary of the New Jersey Comprehensive Outdoor Recreation Plan is a part of the long range Sta...
The principal goals of the 1973 Statewide Comprehensive Outdoor Recreation Plan are[he continual acc...
The 1994-1999 New Jersey Open Space and Outdoor Recreation Plan is the sixth statewide comprehensive...